Using balanced scorecard (BSC) approach to measure performance of the partnering projects

Partnering has been advocated as one of the plausible solutions for improving project performance. Notwithstanding a number of studies about partnering had been undertaken, few of them were contributing to the measure the performance of partnering projects in a holistic manner. This study seeks to investigate the use of Balanced Scorecard (BSC) approach to measure the partnering project performance in a holistic manner. Through an extensive literature review, 36 strategic objectives were identified as the metrics for measuring the partnering project performance. In accordance with their nature, these are further classified into four different perspectives namely: Benefits, Attitudes of project stakeholders, Attitudes enhancement process and Strategic learning & growth. The results of the questionnaire survey generally support the importance to measure the partnering project performance by these perspectives.

[1]  G. Edward Gibson,et al.  Partnering-Project Performance in U.S. Army Corps of Engineers , 1993 .

[2]  Sherif Ali Mohtady Mohamed,et al.  Scorecard Approach to Benchmarking Organizational Safety Culture in Construction , 2003 .

[3]  Peter E.D. Love,et al.  Partnering research in construction , 2000 .

[4]  A. Kadefors Trust in project relationships-inside the black box , 2004 .

[5]  Sai On Cheung,et al.  Behavioral aspects in construction partnering , 2003 .

[6]  George Ofori,et al.  Enhancing integration and innovation in construction , 2002 .

[7]  Carl-Henric Nilsson,et al.  Do quality systems really make a difference? , 2001 .

[8]  Shamil Naoum An overview into the concept of partnering , 2003 .

[9]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[10]  Heng Li,et al.  Development of a conceptual model of construction partnering , 2001 .

[11]  R. Kaplan,et al.  The balanced scorecard--measures that drive performance. , 2015, Harvard business review.

[12]  Subhash Sharma Applied multivariate techniques , 1995 .

[13]  M. Bresnen,et al.  Partnering in construction: a critical review of issues, problems and dilemmas , 2000 .

[14]  Marjan Sarshar,et al.  Assessment of facilities management performance – what next? , 2000 .

[15]  William W. Badger,et al.  Rationale and Benefits Associated with International Alliances , 1995 .

[16]  R. Kaplan,et al.  Using the balanced scorecard as a strategic management system , 1996 .

[17]  David W. Miller,et al.  BEYOND ADR: WORKING TOWARD SYNERGISTIC STRATEGIC PARTNERSHIP , 1995 .

[18]  Carl E. DeVilbiss,et al.  Partnering Is the Foundation of a Learning Organization , 2000 .

[19]  Liang Y Liu,et al.  Impact of management approach on project interaction and performance , 1997 .

[20]  Michael Y. Mak,et al.  Problematic issues associated with project partnering — the contractor perspective , 2002 .

[21]  Akintola Akintoye,et al.  An analysis of success factors and benefits of partnering in construction , 2000 .

[22]  Sai On Cheung,et al.  Trust in construction partnering: views from parties of the partnering dance , 2004 .

[23]  Paul R. Niven,et al.  Balanced Scorecard Step-by-Step: Maximizing Performance and Maintaining Results , 2002 .