Minimizing user delay and crash potential through highway work zone planning.

Lane closures due to highway work zones introduce many challenges to ensuring smooth traffic operations and a safe environment for drivers and workers. In addition, merging has been found to be one of the most stressful aspects of driving and a merge process that is viewed as “unfair” through actions like queue jumping can lead to further unsafe behaviors stemming from “road rage.” To address these issues, the work in this project will focus on lane control solutions for intermediate and long-term highway work zones. In order to evaluate network performance, driver behavior, driver operations, and impacts on safety, several tools were used. Using a combination of field observations, microsimulation, and dynamic traffic assignment tools, the main objective was to develop a procedural guide or decision tree for freeway work zone traffic control planning. This procedural guide would then be presented to the Texas Department of Transportation in a pilot training workshop. Using microsimulation software, with a focus on VISSIM, the analysis of different applications of merge concepts through delay and safety is presented in the project. In order to appropriately draw conclusions about and identify trends of different merge concepts from the microsimulation software, early merge, late merge, and signal merge were first explored in a thorough literature review. In addition to delay and queuing analysis completed using VISSIM, the Federal Highway Administration’s Surrogate Safety Assessment Model (SSAM) was used to address the effects of implementing signal merge on rear-end and lane-change conflicts. Compiling the data collection, VISSIM microsimulation outputs, and SSAM signal merge safety outputs, general conclusions and decisions were provided.

[1]  Andrzej P. Tarko,et al.  SAFETY AND CAPACITY EVALUATION OF THE INDIANA LANE MERGE SYSTEM , 2001 .

[2]  David A Noyce,et al.  Development of Traffic Delay Assessment Tool for Short-Term Closures on Urban Freeways , 2008 .

[3]  Geza Pesti,et al.  TRAFFIC CONTROL STRATEGIES FOR CONGESTED FREEWAYS AND WORK ZONES , 2008 .

[4]  Gang-Len Chang,et al.  Simulation-Based Study on a Lane-Based Signal System for Merge Control at Freeway Work Zones , 2009 .

[5]  Wakeel Ishola Anthony Idewu,et al.  Development and operational analysis of highway alternating merge transition zones , 2009 .

[6]  Jon Bottom,et al.  Dynamic Traffic Assignment: A Primer , 2011 .

[7]  Markos Papageorgiou,et al.  REAL-TIME WORK ZONE MANAGEMENT FOR THROUGHPUT MAXIMIZATION , 2008 .

[8]  Gerald L Ullman,et al.  Theoretical Approach to Predicting Traffic Queues at Short-Term Work Zones on High-Volume Roadways in Urban Areas , 2003 .

[9]  Faculteit Ingenieurswetenschappen,et al.  The Link Transmission Model for Dynamic Network Loading , 2007 .

[10]  Larry Head,et al.  Long Green Times and Cycles at Congested Traffic Signals , 2009 .

[11]  David A Noyce,et al.  TRAFFIC DEMAND DYNAMICS DURING URBAN FREEWAY SHORT-TERM LANE CLOSURES , 2010 .

[12]  Yafeng Yin,et al.  Impact of Lane Closures on Roadway Capacity. Part C: Modeling Diversion Propensity at Work Zones , 2008 .

[13]  Ping Yi,et al.  Synthesis of Unconventional Dynamic Merge Metering Traffic Control for Work Zones , 2010 .

[14]  Gerald L Ullman NATURAL DIVERSION AT TEMPORARY WORK ZONE LANE CLOSURES ON URBAN FREEWAYS IN TEXAS. INTERIM REPORT , 1992 .

[15]  M J Lighthill,et al.  On kinematic waves II. A theory of traffic flow on long crowded roads , 1955, Proceedings of the Royal Society of London. Series A. Mathematical and Physical Sciences.

[16]  Kerrie L Schattler,et al.  Development and Evaluation of an Advanced Dynamic Lane Merge Traffic Control System For 3 To 2 Lane Transition Areas in Work Zones , 2004 .

[17]  K N Womack,et al.  UNDERSTANDING ROAD RAGE: SUMMARY OF FIRST-YEAR PROJECT ACTIVITIES , 2000 .

[18]  G. F. Newell A simplified theory of kinematic waves in highway traffic, part I: General theory , 1993 .

[19]  Kyeong-Pyo Kang,et al.  Dynamic Late Merge Control at Highway Work Zones: Evaluation, Observations, and Suggestions , 2005 .

[20]  Patrick T McCoy,et al.  Dynamic Late Merge–Control Concept for Work Zones on Rural Interstate Highways , 2001 .