Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA

Purpose – The risk factors associated with clients have a major impact on the successful delivery of a project from early design to the construction and operation stages. Risk management studies conducted so far have not succeeded in providing an effective risk assessment methodology for clients in analysing and managing the risk factors that cause both project delays and cost overruns. So, the purpose of this paper is to provide a methodology for a client-based risk management model. Design/methodology/approach – A conceptual framework is designed by integrating the findings from a literature review and a construction industry survey in the Kingdom of Saudi Arabia. The framework includes the risk identification, risk analysis and mitigation strategy, which are the key components of the model. The model of the framework is developed by integrating the analytical hierarchy process (AHP) and Monte Carlo simulation (MCS) underpinned within an @Risk program. Findings – A case study is used to demonstrate the ...

[1]  J. K. Hull Application of risk analysis techniques in proposal assessment , 1990 .

[2]  María Teresa Lamata,et al.  Consistency in the Analytic Hierarchy Process: a New Approach , 2006, Int. J. Uncertain. Fuzziness Knowl. Based Syst..

[3]  Martin Skitmore,et al.  Causes of delays in Saudi Arabian public sector construction projects , 2009 .

[4]  Jamal F. Al‐Bahar,et al.  Systematic Risk Management Approach for Construction Projects , 1990 .

[5]  Daniel W. Halpin,et al.  Pile construction productivity assessment , 2005 .

[6]  Athanasios C Karmperis,et al.  Waste management project's alternatives: A risk-based multi-criteria assessment (RBMCA) approach. , 2012, Waste management.

[7]  David K. H. Chua,et al.  Key determinants for construction schedule performance , 1999 .

[8]  Awad S. Hanna,et al.  Early warning signs for distressed projects , 2005 .

[9]  Witold Pedrycz,et al.  Fuzzy Monte Carlo Simulation and Risk Assessment in Construction , 2010, Comput. Aided Civ. Infrastructure Eng..

[10]  James E. Rowings,et al.  Construction Labor Productivity Modeling with Neural Networks , 1998 .

[11]  Sławomir Biruk,et al.  THE CONCEPTUAL FRAMEWORK FOR CONSTRUCTION PROJECT RISK ASSESSMENT , 2011 .

[12]  Irem Dikmen,et al.  An analytic hierarchy process based model for risk and opportunity assessment of international construction projects , 2006 .

[13]  Makarand Hastak,et al.  ICRAM-1: Model for International Construction Risk Assessment , 2000 .

[14]  David K. H. Chua,et al.  Model for Construction Budget Performance—Neural Network Approach , 1997 .

[15]  Daniel W. Halpin,et al.  Predictive Tool for Estimating Accident Risk , 2003 .

[16]  Leslie Edwards Practical Risk Management in the Construction Industry , 1996 .

[17]  Thomas L. Saaty,et al.  Group Decision Making: Drawing Out and Reconciling Differences , 2007 .

[18]  Prasanta Kumar Dey Decision support system for risk management: a case study , 2001 .

[19]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[20]  Sung-Lin Hsueh,et al.  On-line multi-criterion risk assessment model for construction joint ventures in China , 2007 .

[21]  Abdulaziz A. Bubshait,et al.  Comparison of delay analysis methodologies , 1998 .

[22]  S. Sharma,et al.  Risk Management in Construction Projects , 2011 .

[23]  T. Saaty,et al.  The Analytic Hierarchy Process , 1985 .

[24]  R. Chapman Simple Tools and Techniques for Enterprise Risk Management , 2006 .

[25]  T. Saaty Highlights and critical points in the theory and application of the Analytic Hierarchy Process , 1994 .

[26]  Roger Flanagan,et al.  Risk Management and Construction , 1993 .

[27]  Nashwan Dawood Estimating project and activity duration: a risk management approach using network analysis , 1998 .

[28]  Edward J. Jaselskis,et al.  Optimal Allocation of Project Management Resources for Achieving Success , 1991 .

[29]  Peter Hoonakker,et al.  Barriers and benefits of quality management in the construction industry: An empirical study , 2010 .

[30]  Simaan M. AbouRizk,et al.  Estimating Labor Production Rates for Industrial Construction Activities , 2001 .