A Readjustment Procedure after Signalling in the Integrated Process Control
暂无分享,去创建一个
[1] Wei Jiang. A joint monitoring scheme for automatically controlled processes , 2004 .
[2] Changsoon Park. An algorithm for the properties of the integrated process control with bounded adjustments and EWMA monitoring , 2007 .
[3] Enrique Del Castillo,et al. Integration of Sequential Process Adjustment and Process Monitoring Techniques , 2003 .
[4] Changsoon Park,et al. Economic design of an integrated process control procedure with repeated adjustments and EWMA monitoring , 2008 .
[5] George C. Runger,et al. Relationships Among Control Charts Used with Feedback Control , 2006, Qual. Reliab. Eng. Int..
[6] George E. P. Box,et al. Statistical process monitoring and feedback adjustment: a discussion , 1992 .
[7] S. A. Vander Wiel,et al. Monitoring processes that wander using integrated moving average models , 1996 .
[8] Shuohui Chen,et al. Cuscore control charts for generalized feedback-control systems , 2007, Qual. Reliab. Eng. Int..