Sensor based motion planning and estimation of highrise building façade maintenance robot
暂无分享,去创建一个
[1] A. Hunt,et al. Wind-tunnel measurements of surface pressures on cubic building models at several scales , 1982 .
[2] Sung Jin Yoo,et al. Brief paper: adaptive formation tracking control of electrically driven multiple mobile robots , 2010 .
[3] Jing Wu,et al. A Study on Hybrid Force/ Motion Control for Automated Robotic Building Maintenance System , 2011 .
[4] Karsten Berns,et al. CROMSCI: development of a climbing robot with negative pressure adhesion for inspections , 2008, Ind. Robot.
[5] Chang-Soo Han,et al. A survey of climbing robots: Locomotion and adhesion , 2010 .
[6] Peter Brucker,et al. Scheduling Algorithms , 1995 .
[7] Edward G. Coffman,et al. Scheduling independent tasks to reduce mean finishing time , 1974, CACM.
[8] Maja J. Mataric,et al. Behaviour-based control: examples from navigation, learning, and group behaviour , 1997, J. Exp. Theor. Artif. Intell..
[9] David Surry,et al. Pressure measurements on the Texas tech building: Wind tunnel measurements and comparisons with full scale , 1991 .
[10] Douglas A. Wolfe,et al. Nonparametric Statistical Methods , 1973 .
[11] Vijay Kumar,et al. Dynamic role assignment for cooperative robots , 2002, Proceedings 2002 IEEE International Conference on Robotics and Automation (Cat. No.02CH37292).
[12] A. Albagul,et al. Design and fabrication of an automatic window cleaning robot , 2010 .
[13] Anna Kochan. CLAWAR highlights research progress on climbing and walking robots , 2006, Ind. Robot.
[14] Norbert Elkmann,et al. SIRIUSc — Facade Cleaning Robot for a High-Rise Building in Munich, Germany , 2005 .
[15] L. Cochran,et al. Sources of Torsional Wind Loading on Tall Buildings: Lessons from the Wind Tunnel , 2000 .
[16] Anna Kochan,et al. CLAWAR highlights research progress on climbing and walking robots , 2005, Ind. Robot.
[17] D. T. Pham,et al. Application of the Taguchi method to the design of a robot sensor , 1995, Robotica.
[18] J. Neter,et al. Applied Linear Regression Models , 1983 .
[19] Subhabrata Chakraborti,et al. Nonparametric Statistical Inference , 2011, International Encyclopedia of Statistical Science.
[20] Pablo González de Santos,et al. Application of CLAWAR Machines , 2003, Int. J. Robotics Res..
[21] Toshiyuki Yasuda,et al. Multi-Robot Systems, Trends and Development , 2011 .
[22] Ronald L. Rivest,et al. Introduction to Algorithms , 1990 .
[23] Luigi Fortuna,et al. Soft Sensors for Monitoring and Control of Industrial Processes (Advances in Industrial Control) , 2006 .
[24] Maja J. Mataric,et al. Multi-robot task allocation: analyzing the complexity and optimality of key architectures , 2003, 2003 IEEE International Conference on Robotics and Automation (Cat. No.03CH37422).
[25] A. Cameron,et al. Closure to “Discussion of ‘The Measurement of Oil-Film Thickness in Gear Teeth’” (1960, ASME J. Basic Eng., 82, p. 34) , 1960 .
[26] A. K. Munns,et al. Building maintenance strategy: a new management approach , 1997 .
[27] Jianwei Zhang,et al. Sky Cleaner 3: a real pneumatic climbing robot for glass-wall cleaning , 2006, IEEE Robotics & Automation Magazine.
[28] A H Christer. Modelling Inspection Policies for Building Maintenance , 1982, The Journal of the Operational Research Society.
[29] Chang-Soo Han,et al. Window Contamination Detection Method for the Robotic Building Maintenance System , 2011 .
[30] S. Iqbal,et al. Design optimization using ANOVA , 2002 .