Re-entry prediction of spent rocket bodies in GTO

Spent upper stages are bodies consisting of components likely to survive re-entry, for example propellant tanks. Therefore, the re-entry of upper stages might be associated with high on-ground casualty risk. This paper presents a tool for re-entry prediction of spent rocket bodies in GTO based exclusively on Two Line Element set (TLE) data. TLE analysis and filtering, spacecraft parameters estimation, and combined state and parameters estimation are the main building blocks of the tool. The performance of the tool is assessed by computing the accuracy of the re-entry prediction of 92 GTO objects, which re-entered in the past 50 years.

[1]  D. Vallado Fundamentals of Astrodynamics and Applications , 1997 .

[2]  J. Betts Survey of Numerical Methods for Trajectory Optimization , 1998 .

[3]  Holger Krag,et al.  Assessment and Categorization of TLE Orbit Errors for the US SSN Catalogue , 2008 .

[4]  T. S. Kelso,et al.  Revisiting Spacetrack Report #3 , 2006 .

[5]  A. Morselli,et al.  A high order method for orbital conjunctions analysis: Sensitivity to initial uncertainties , 2014 .

[6]  Tom Kelecy,et al.  Satellite Maneuver Detection Using Two-line Element ( TLE ) Data , 2007 .

[7]  Dirk Brouwer,et al.  SOLUTION OF THE PROBLEM OF ARTIFICIAL SATELLITE THEORY WITHOUT DRAG , 1959 .

[8]  Felix R. Hoots,et al.  SPACETRACK REPORT NO. 3 Models for Propagation of , 1988 .

[9]  Alessandro Rossi,et al.  Space debris , 2011, Scholarpedia.

[10]  Laura Aivar Garcia,et al.  OPERA: A tool for lifetime prediction based on orbit determination from TLE data , 2014 .

[11]  William Marshall,et al.  Improved orbit predictions using two-line elements , 2010, 1002.2277.

[12]  H. Krag,et al.  Improving ESA's Collision Risk Estimates by an Assessment of the TLE orbit Errors of the US SSN Catalogue , 2009 .

[13]  Hugh G. Lewis,et al.  Deriving Accurate Satellite Ballistic Coefficients from Two-Line Element Data , 2012 .

[14]  T. S. Cssi Kelso,et al.  Validation of SGP4 and IS-GPS-200D Against GPS Precision Ephemerides , 2007 .

[15]  M. J. Walker A set of modified equinoctial orbit elements , 1985 .

[16]  M. Mutyalarao,et al.  On prediction of re-entry time of an upper stage from GTO , 2011 .

[17]  H. Krag,et al.  Two-Line-Elements-Based Maneuver Detection Methods for Satellites in Low Earth Orbit , 2014 .

[18]  Benjamin Bastida Virgili,et al.  Improved SSA Through Orbit Determination of Two-Line Element Sets , 2013 .