Performance evaluation of unbalanced serial production lines

Abstract Here an efficient approximation method is proposed to evaluate the throughput rate of unbalanced serial production lines. The approximation method analyses successive pairs of adjacent stations and then the solution of a previous two-station system is used in the analysis of the next pair. A number of experiments were performed by simulation for the two-station system. Predictive models of the throughput and the coefficient of variation of interdeparture times for the two-station system have been derived from regression analysis. The line throughput rate of a larger system can be evaluated by repetitively applying these models. Numerical results show that the proposed method works very well even for long production lines. Based on these results, the problem of buffer capacity design is also discussed. Dynamic programming algorithms are proposed to determine the minimum number of total buffer units required and to provide guidelines for buffer allocation to achieve a given target throughput rate.

[1]  Roger L. Burford,et al.  Some observations on the bowl phenomenon , 1988 .

[2]  Neil B. Marks Output analysis of an automated serial assembly line , 1987 .

[3]  Robert F. Love,et al.  A Model for Optimizing the Buffer Inventory Storage Size in a Sequential Production System , 1970 .

[4]  Yu-Chi Ho,et al.  A gradient technique for general buffer storage design in a production line , 1979 .

[5]  Dennis E. Blumenfeld,et al.  A simple formula for estimating throughput of serial production lines with variable processing times and limited buffer capacity , 1990 .

[6]  Colin L. Moodie,et al.  OPTIMAL BUFFER STORAGE CAPACITY IN PRODUCTION , 1968 .

[7]  Hajime Yamashina,et al.  Analysis of in-process buffers for multi-stage transfer line systems , 1983 .

[8]  Yves Dallery,et al.  Manufacturing flow line systems: a review of models and analytical results , 1992, Queueing Syst. Theory Appl..

[9]  R. N. Basu,et al.  The interstage buffer storage capacity of non-powered assembly lines A simple mathematical approach , 1977 .

[10]  F. Hillier,et al.  On the Optimal Allocation of Work in Symmetrically Unbalanced Production Line Systems with Variable Operation Times , 1979 .

[11]  S. Panwalkar,et al.  A Predictive Equation for Average Output of K Stage Series Systems with Finite Interstage Queues , 1979 .

[12]  Ezey M. Dar-El,et al.  Predicting the performance of unpaced assembly lines where one station variability may be smaller than the others , 1989 .

[13]  P. C. Pandey,et al.  Efficiency of manual flow line systems—predictive equations , 1987 .

[14]  T. E. El-Rayah,et al.  The efficiency of balanced and unbalanced production lines , 1979 .

[15]  William L. Maxwell,et al.  The Role of Work-in-Process Inventory in Serial Production Lines , 1988, Oper. Res..

[16]  Kut C. So,et al.  On the efficiency of unbalancing production lines , 1989 .

[17]  We-Min Chow,et al.  Buffer capacity analysis for sequential production lines with variable process times , 1987 .

[18]  J. George Shanthikumar,et al.  Determination of Optimal Buffer Storage Capacities and Optimal Allocation in Multistage Automatic Transfer Lines , 1989 .

[19]  A. D. Knott,et al.  THE INEFFICIENCY OF A SERIES OF WORK STATIONS—A SIMPLE FORMULA , 1970 .