Determination of an Optimized Generator Expansion Pattern

A series of programs developed for a small-scale digital computer, such as the IBM (International Business Machines Corporation) 650, to optimize the selection of future additions to generating capacity are discussed. Two detailed programs show how the annual load-duration curve has been adapted to propagate a series of new generator-requirement curves. These curves, giving new generation needs by type for future years, are then available for use in other programs mentioned which develop real expansion patterns and all costs associated with them.

[1]  L. E. Jensen,et al.  Digital Program for the Economic Selection of Generating Capacity Additions , 1958, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[2]  T. W. Schroeder,et al.  Economic Selection of Generating Capacity Additions , 1958, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[3]  W. D. Marsh,et al.  An Approach to Peak Load Economics , 1960, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[4]  L. K. Kirchmayer,et al.  An Investigation of the Economic Size of Steam-Electric Generating Units [includes discussion] , 1955, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.

[5]  Kenneth L. Hicks Theory of Economic Selection of Generating Units , 1959, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.