Flexibility Approach in the Runway Pavement Using FLEMANCO Method

Abstract The pressing problems of managing construction processes reveal themselves in discrepancies between plan and execution which seems to result in considerable measure from dependence on the changing environment. High variability, dynamics and uncertainty of execution conditions generate disturbances which could be avoided by applying flexibility ‐ creating a range of executive options enabling adjustment to changing environmental conditions. The principal advantages of implementing the proposed FLEMANCO (FLExibility MANagement in the COnstruction industry) method include better consistency between planning and an actual course of execution, lower changes in costs and execution time by considering various scenarios of execution conditions, the possibility of loss prevention and taking advantage of opportunities connected with the changing environment etc. The presented example concerns concreting a runway, although similar problems occur in concreting roads, yards, bridges as well as erecting high b...

[1]  Zenonas Turskis,et al.  Multi‐attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique , 2008 .

[2]  David Upton,et al.  Flexibility as process mobility: The management of plant capabilities for quick response manufacturing , 1995 .

[3]  John A. Buzacott,et al.  Flexibility and decision making , 1990 .

[4]  H. Randolph Thomas,et al.  Fundamental principles of workforce management , 2006 .

[5]  Daniel W. Halpin Adaptation of Flexible Manufacturing Concepts to Construction , 1987 .

[6]  Edmundas Kazimieras Zavadskas,et al.  MODELLING RENEWAL OF CONSTRUCTION OBJECTS APPLYING METHODS OF THE GAME THEORY , 2006 .

[7]  Edmundas Kazimieras Zavadskas,et al.  SELECTION OF THE EFFECTIVE DWELLING HOUSE WALLS BY APPLYING ATTRIBUTES VALUES DETERMINED AT INTERVALS , 2008 .

[8]  K M Bartol,et al.  Management: A Pacific Rim Focus, 5th edition , 2007 .

[9]  Harold R. Booher,et al.  Handbook of Human Systems Integration , 2003 .

[10]  Henk W. Volberda,et al.  Building the Flexible Firm: How to Remain Competitive , 1998 .

[11]  H. R. Booher,et al.  Handbook of Human Systems Integration: Booher/Human Systems Integration , 2005 .

[12]  Min-Yuan Cheng,et al.  Simulation‐enhanced approach for ranking major transport projects , 2006 .

[13]  E. Zavadskas,et al.  Defining the utility and market value of a real estate: A multiple criteria approach , 2007 .

[14]  Javier Pereira,et al.  Flexibility in manufacturing systems: A relational and a dynamic approach , 2001, Eur. J. Oper. Res..

[15]  Aviad Shapira,et al.  Only Dynamics Can Absorb Dynamics , 2006 .

[16]  H. Volberda Building the Flexible Firm , 1999 .

[17]  Marius Jakimavičius,et al.  Automobile transport system analysis and ranking in Lithuanian administrative regions , 2007 .

[18]  G. J. Lewis,et al.  The measurement of environmental performance: an application of Ashby's law , 2003 .

[19]  Edmundas Kazimieras Zavadskas,et al.  Multi-attribute Assessment of Road Design Solutions by Using the COPRAS Method , 2007 .

[20]  Richard de Neufville,et al.  Dynamic strategic planning for technology policy , 2000, Int. J. Technol. Manag..

[21]  Vassilios Kazakidis,et al.  Decision Making in Flexible Mine Production System Design Using Real Options , 2007 .

[22]  Jurgita Antucheviciene,et al.  Evaluation of Ranking Accuracy in Multi-Criteria Decisions , 2006, Informatica.

[23]  D. Eppink Planning for strategic flexibility , 1978 .

[24]  Edmundas Kazimieras Zavadskas,et al.  Sustainable city compactness evaluation on the basis of GIS and bayes rule , 2006 .

[25]  Kim Wikström,et al.  Defining uncertainty in projects – a new perspective , 2008 .

[26]  Nils O.E. Olsson,et al.  Management of flexibility in projects , 2006 .

[27]  Kathryn M. Bartol Management: A Pacific Rim Focus , 1991 .

[28]  Edmundas Kazimieras Zavadskas,et al.  Selection of low-e windows in retrofit of public buildings by applying multiple criteria method COPRAS: A Lithuanian case , 2006 .

[29]  Edmundas Kazimieras Zavadskas,et al.  Multi‐objective decision‐making for road design , 2008 .

[30]  Colin L. Moodie,et al.  Definition and Classification of Manufacturing Flexibility Types and Measures , 1998 .

[31]  J. S. Evans STRATEGIC FLEXIBILITY FOR HIGH TECHNOLOGY MANOEUVRES: A CONCEPTUAL FRAMEWORK , 1991 .

[32]  Juozas Bivainis,et al.  Assessment of Employee's Knowledge Potential in Transport Sector , 2008 .