Robust single machine scheduling with a flexible maintenance activity
暂无分享,去创建一个
Andrea Pacifici | Gaia Nicosia | Paolo Detti | Garazi Zabalo Manrique de Lara | A. Pacifici | P. Detti | G. Nicosia
[1] Adam Kasperski,et al. An approximation algorithm for interval data minmax regret combinatorial optimization problems , 2006, Inf. Process. Lett..
[2] Panagiotis Kouvelis,et al. Robust scheduling to hedge against processing time uncertainty in single-stage production , 1995 .
[3] Jen-Shiang Chen,et al. Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan , 2008, Eur. J. Oper. Res..
[4] Oscar H. Ibarra,et al. Fast Approximation Algorithms for the Knapsack and Sum of Subset Problems , 1975, JACM.
[5] Igor Averbakh,et al. Complexity of minimizing the total flow time with interval data and minmax regret criterion , 2006, Discret. Appl. Math..
[6] D. Yang,et al. Single machine total completion time scheduling problem with workload-dependent maintenance duration , 2015 .
[7] A Gerodimos,et al. Robust Discrete Optimization and its Applications , 1996, J. Oper. Res. Soc..
[8] Alessandro Agnetis,et al. Scheduling two agent task chains with a central selection mechanism , 2015, J. Sched..
[9] Yong Chen,et al. Complexity and approximation of single machine scheduling with an operator non-availability period to minimize total completion time , 2013, Inf. Sci..
[10] Eduardo Conde,et al. A MIP formulation for the minmax regret total completion time in scheduling with unrelated parallel machines , 2014, Optim. Lett..
[11] Robert J. Vanderbei,et al. Robust Optimization of Large-Scale Systems , 1995, Oper. Res..
[12] Chengbin Chu,et al. A survey of scheduling with deterministic machine availability constraints , 2010, Comput. Ind. Eng..
[13] T.C.E. Cheng,et al. Single machine scheduling with a restricted rate‐modifying activity , 2005 .
[14] Roberto Montemanni,et al. A Mixed Integer Programming Formulation for the Total Flow Time Single Machine Robust Scheduling Problem with Interval Data , 2007, J. Math. Model. Algorithms.
[15] Jordi Pereira,et al. The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective , 2016, Comput. Oper. Res..
[16] Jian-Bo Yang,et al. Minimizing total completion time on a single machine with a flexible maintenance activity , 2011, Comput. Oper. Res..
[17] Chung-Cheng Lu,et al. Robust scheduling on a single machine to minimize total flow time , 2012, Comput. Oper. Res..
[18] Dehua Xu,et al. A note on "scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan" , 2009, Eur. J. Oper. Res..
[19] Chung-Yee Lee,et al. Machine scheduling with an availability constraint , 1996, J. Glob. Optim..
[20] Hans Kellerer,et al. An efficient fully polynomial approximation scheme for the Subset-Sum Problem , 2003, J. Comput. Syst. Sci..
[21] Jian Yang,et al. On the Robust Single Machine Scheduling Problem , 2002, J. Comb. Optim..
[22] Andrea Pacifici,et al. Scheduling assembly tasks with caterpillar precedence constraints on dedicated machines , 2017 .
[23] Alexander H. G. Rinnooy Kan,et al. Single machine flow-time scheduling with a single breakdown , 1989, Acta Informatica.
[24] Andrea Pacifici,et al. Robust single machine scheduling with external-party jobs , 2016 .