Structural Equation Model for Evaluating Factors Affecting Quality of Social Infrastructure Projects

The quality of the constructed social infrastructure project has been considered a necessary measure for the sustainability of projects. Studies on factors affecting project quality have used various techniques and methods to explain the relationships between particular variables. Unexpectedly, Structural Equation Modeling (SEM) has acquired very little concern in factors affecting project quality studies. To address this limitation in the body of knowledge, the objective of this study was to apply the SEM approach and build a model that explained and identified the critical factors affecting quality in social infrastructure projects. The authors developed a quantitative approach using smart-PLS version 3.2.7. This study shed light on the views of different experts based on their experience in public construction projects in Pakistan. Particularly, the authors aimed to find out the relationships between construction, stakeholders, materials, design, and external factors, and how these relate to project quality. The findings of this study revealed that the R2 value of the model was scored at 0.749, which meant that the five exogenous latent constructs collectively explained 74.9% of the variance in project quality. The Goodness-of-Fit of the model was 0.458. The construction related factor was the most important out of the five constructs. This study determined that better planning and monitoring and evaluation should be developed to better address and control the quality defects by decision-makers, project managers as well as contractors. These findings might support practitioners and decision makers to focus on quality related problems that might occur in their current or future projects.

[1]  Mohammed A. Salem Hiyassat Applying the ISO standards to a construction company: a case study , 2000 .

[2]  S. Hussain,et al.  Rural Residents’ Perception of Construction Project Delays in Pakistan , 2017 .

[3]  Robert Ho,et al.  Handbook of Univariate and Multivariate Data Analysis with IBM SPSS , 2013 .

[4]  Mike Kaye,et al.  Continuous improvement: the ten essential criteria , 1999 .

[5]  J. Reilly Cost estimating and risk ‚Äì management for underground projects , 2005 .

[6]  Low Sui Pheng,et al.  A framework for implementing TQM in construction , 1996 .

[7]  Luai Jraisat,et al.  Quality in construction management: an exploratory study , 2016 .

[8]  M. Lewis,et al.  Evaluating the risks of public private partnerships for infrastructure projects , 2002 .

[9]  Mohd Nasrun Mohd Nawi,et al.  Does government support matter? Influence of organizational culture on sustainable construction among Malaysian contractors , 2018 .

[10]  Roger Atkinson,et al.  Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .

[11]  R. A. Mohsini,et al.  Determinants of performance in the traditional building process , 1992 .

[12]  David Arditi,et al.  Total quality management in the construction process , 1997 .

[13]  A. Türk,et al.  ISO 9000 in construction: An examination of its application in Turkey , 2006 .

[14]  Rudolf R. Sinkovics,et al.  The Use of Partial Least Squares Path Modeling in International Marketing , 2009 .

[15]  C. M. Tam,et al.  Quest for continuous quality improvement for public housing construction in Hong Kong , 2000 .

[16]  Serdar Ulubeyli,et al.  Evaluations of Construction Project Participants’ Attitudes toward Quality Management in Turkey , 2017 .

[17]  Chao Mao,et al.  Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system: A case study from China , 2015 .

[18]  Michael Pitt,et al.  Awareness and effectiveness of quality function deployment (QFD) in design and build projects in Nigeria , 2014 .

[19]  R. Müller,et al.  Relationships Between a Project Management Methodology and Project Success in Different Project Governance Contexts , 2015, Project Management Methodologies, Governance and Success.

[20]  Marko Sarstedt,et al.  PLS-SEM: Indeed a Silver Bullet , 2011 .

[21]  Abdulaziz A. Bubshait,et al.  ISO 9000 QUALITY STANDARDS IN CONSTRUCTION , 1999 .

[22]  Joseph Moses Juran,et al.  Product Quality-A Prescription for the West, Part I , 1981 .

[23]  Florence Yean Yng Ling,et al.  Predicting Performance of Design-Build and Design-Bid-Build Projects , 2004 .

[24]  F. Chen Sensitivity of Goodness of Fit Indexes to Lack of Measurement Invariance , 2007 .

[25]  C. Fornell,et al.  Evaluating structural equation models with unobservable variables and measurement error. , 1981 .

[26]  Jacob Cohen Statistical Power Analysis for the Behavioral Sciences , 1969, The SAGE Encyclopedia of Research Design.

[27]  Stephen O. Ogunlana,et al.  A study on project success factors in large construction projects in Vietnam , 2004 .

[28]  Fujun Lai,et al.  Using Partial Least Squares in Operations Management Research: A Practical Guideline and Summary of Past Research , 2012 .

[29]  Ping Yung,et al.  Construction quality in China during transition: A review of literature and empirical examination , 2010 .

[30]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[31]  Sathyanarayanan Rajendran,et al.  Relationship between Construction Safety and Quality Performance , 2013 .

[32]  K. N. Jha,et al.  Critical Factors Affecting Quality Performance in Construction Projects , 2006 .

[33]  Lukumon O. Oyedele,et al.  Critical factors affecting construction quality in Nigeria: evidence from industry professionals , 2015 .

[34]  Anthony Walker,et al.  The Construction Industry in Hong Kong , 1995 .

[35]  Anil Sawhney,et al.  Structural equation model for assessing impacts of contractor's performance on project success , 2011 .

[36]  Alan Griffith Quality Assurance in Building , 1990 .

[37]  Robert Albanese Team‐Building Process: Key to Better Project Results , 1994 .

[38]  Peter Hoonakker,et al.  Barriers and benefits of quality management in the construction industry: An empirical study , 2010 .

[39]  P. Bentler,et al.  Fit indices in covariance structure modeling : Sensitivity to underparameterized model misspecification , 1998 .

[40]  Amrik S. Sohal,et al.  A systemic approach to quality improvements: The interactions between the technical, human and quality systems , 1998 .

[41]  Alfredo Serpell Integrating quality systems in construction projects: the Chilean case , 1999 .

[42]  Refaat H. Abdel-Razek Factors affecting construction quality in Egypt: identification and relative importance , 1998 .

[43]  Michel Tenenhaus,et al.  PLS path modeling , 2005, Comput. Stat. Data Anal..

[44]  Peter Hoonakker,et al.  Quality and Safety Management in Construction , 2006 .

[45]  Allan F. Samuels CONSTRUCTION FACILITIES AUDIT: QUALITY SYSTEM-PERFORMANCE CONTROL , 1994 .

[46]  Terry Cooke-Davies,et al.  The “real” success factors on projects , 2002 .

[47]  Wynne W. Chin The partial least squares approach for structural equation modeling. , 1998 .

[48]  Peter E.D. Love,et al.  Some empirical observations of service quality in construction , 2000 .

[49]  Albert P.C. Chan,et al.  Factors affecting the quality of building projects in Hong Kong , 2000 .

[50]  A. Wong,et al.  Total quality management in the construction industry in Hong Kong: A supply chain management perspective , 1999 .

[51]  L. A. Clark,et al.  Obstacles to implementing total quality management in the UK construction industry , 1998 .

[52]  Patrick T.I. Lam,et al.  Assessing quality relationships in public housing: An empirical study , 2006 .

[53]  Marko Sarstedt,et al.  An assessment of the use of partial least squares structural equation modeling in marketing research , 2012 .

[54]  Kerstin Liehr-Gobbers,et al.  Evaluation of Structural Equation Models Using the Partial Least Squares (PLS) Approach , 2010 .

[55]  P. Love,et al.  Unearthing the nature and interplay of quality and safety in construction projects: an empirical study , 2018 .

[56]  Gopal K. Kanji,et al.  Quality culture in the construction industry , 1998 .

[57]  Steve Rowlinson,et al.  How important is cooperation to construction project success? A grounded empirical quantification , 2004 .

[58]  Ahmed Ebrahim Abu El-Maaty,et al.  Management of Highway Projects in Egypt through Identifying Factors Influencing Quality Performance , 2016 .

[59]  Y. C. Kog,et al.  Critical Success Factors for Different Project Objectives , 1999 .

[60]  Tony Auchterlounie Recurring quality issues in the UK private house building industry , 2009 .

[61]  Sek Chew Yeoh,et al.  ISO 9002 in the Malaysian construction industry : guide and implementation , 1996 .

[62]  Sherif Ali Mohtady Mohamed,et al.  Factors affecting the performance of construction projects in the Gaza Strip , 2009 .

[63]  Antonio Leal,et al.  Relationships between the EFQM model criteria: a study in Spanish universities , 2005 .

[64]  Rifat N. Rustom,et al.  MODELING THE FACTORS AFFECTING QUALITY IN BUILDING CONSTRUCTION PROJECTS IN GAZA STRIP , 2006 .

[65]  S. Straub,et al.  Infrastructure and Growth in Developing Countries: Recent Advances and Research Challenges , 2008 .

[66]  David Arditi,et al.  FACTORS THAT AFFECT PROCESS QUALITY IN THE LIFE CYCLE OF BUILDING PROJECTS , 1998 .

[67]  Luong Hai Nguyen,et al.  The Impact of Project Organizational Culture on the Performance of Construction Projects , 2017 .

[68]  C. William Ibbs,et al.  Determinants of international architectural, engineering, and construction firms' project success in China , 2006 .

[69]  Vivian W. Y Tam,et al.  Critical Factors Affecting the Quality of Industrialized Building System Projects in China , 2017 .

[70]  Sami Kärnä,et al.  Analysing customer satisfaction and quality in construction – the case of public and private customers , 2004 .

[71]  Geoffrey S. Hubona,et al.  Using PLS path modeling in new technology research: updated guidelines , 2016, Ind. Manag. Data Syst..

[72]  Andi,et al.  Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process , 2003 .

[73]  Ronie Navon,et al.  Automated project performance control of construction projects , 2005 .

[74]  Marko Sarstedt,et al.  Partial least squares structural equation modeling (PLS-SEM): A useful tool for family business researchers , 2014 .

[75]  Marko Sarstedt,et al.  Editorial - Partial Least Squares Structural Equation Modeling: Rigorous Applications, Better Results and Higher Acceptance , 2013 .

[76]  Chien-Liang Lin,et al.  Exploring Interface Problems in Taiwan’s Construction Projects Using Structural Equation Modeling , 2017 .