Reliable design of a closed loop supply chain network under uncertainty: An interval fuzzy possibilistic chance-constrained model

This article seeks to offer a systematic approach to establishing a reliable network of facilities in closed loop supply chains (CLSCs) under uncertainties. Facilities that are located in this article concurrently satisfy both traditional objective functions and reliability considerations in CLSC network designs. To attack this problem, a novel mathematical model is developed that integrates the network design decisions in both forward and reverse supply chain networks. The model also utilizes an effective reliability approach to find a robust network design. In order to make the results of this article more realistic, a CLSC for a case study in the iron and steel industry has been explored. The considered CLSC is multi-echelon, multi-facility, multi-product and multi-supplier. Furthermore, multiple facilities exist in the reverse logistics network leading to high complexities. Since the collection centres play an important role in this network, the reliability concept of these facilities is taken into consideration. To solve the proposed model, a novel interactive hybrid solution methodology is developed by combining a number of efficient solution approaches from the recent literature. The proposed solution methodology is a bi-objective interval fuzzy possibilistic chance-constraint mixed integer linear programming (BOIFPCCMILP). Finally, computational experiments are provided to demonstrate the applicability and suitability of the proposed model in a supply chain environment and to help decision makers facilitate their analyses.

[1]  Brian W. Baetz,et al.  Optimization/Simulation Modeling for Waste Management Capacity Planning , 1990 .

[2]  Guo H. Huang,et al.  An interval-parameter fuzzy nonlinear optimization model for stream water quality management under uncertainty , 2007, Eur. J. Oper. Res..

[3]  A. Szirmai,et al.  The Tanzanian scrap recycling cycle , 2002 .

[4]  S.A. Torabi,et al.  An interactive possibilistic programming approach for multiple objective supply chain master planning , 2008, Fuzzy Sets Syst..

[5]  H. Zimmermann Fuzzy programming and linear programming with several objective functions , 1978 .

[6]  Nathalie Bostel,et al.  A facility location model for logistics systems including reverse flows: The case of remanufacturing activities , 2007, Comput. Oper. Res..

[7]  Ali Diabat,et al.  A reverse logistics network design , 2015 .

[8]  H.L. Lee,et al.  Aligning Supply Chain Strategies with Product Uncertainties , 2002, IEEE Engineering Management Review.

[9]  C. Hwang,et al.  Possibilistic linear programming for managing interest rate risk , 1993 .

[10]  Juite Wang,et al.  A possibilistic decision model for new product supply chain design , 2007, Eur. J. Oper. Res..

[11]  Masatoshi Sakawa,et al.  An Interactive Fuzzy Satisficing Method for Multiobjective Linear-Programming Problems and Its Application , 1987, IEEE Transactions on Systems, Man, and Cybernetics.

[12]  Benita M. Beamon,et al.  Supply-chain network configuration for product recovery , 2004 .

[13]  Brigitte Werners,et al.  Aggregation Models in Mathematical Programming , 1988 .

[14]  Guo H. Huang,et al.  An interval-valued fuzzy-stochastic programming approach and its application to municipal solid waste management , 2012, Environ. Model. Softw..

[15]  Xingsheng Gu,et al.  Chance constrained programming models for refinery short-term crude oil scheduling problem , 2009 .

[16]  Elif Akçali,et al.  Benders decomposition with alternative multiple cuts for a multi‐product closed‐loop supply chain network design model , 2007 .

[17]  Xiaosheng Qin,et al.  Agricultural effluent control under uncertainty: An inexact double-sided fuzzy chance-constrained model , 2010 .

[18]  Guohe Huang,et al.  A GREY LINEAR PROGRAMMING APPROACH FOR MUNICIPAL SOLID WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY , 1992 .

[19]  Irem Ozkarahan,et al.  A supply chain distribution network design model: An interactive fuzzy goal programming-based solution approach , 2008 .

[20]  Lawrence V. Snyder,et al.  Reliability Models for Facility Location: The Expected Failure Cost Case , 2005, Transp. Sci..

[21]  M. Fiedler,et al.  Linear Optimization Problems with Inexact Data , 2006 .

[22]  Hokey Min,et al.  THE DYNAMIC DESIGN OF A REVERSE LOGISTICS NETWORK FROM THE PERSPECTIVE OF THIRD-PARTY LOGISTICS SERVICE PROVIDERS , 2008 .

[23]  Jiuh-Biing Sheu,et al.  An Integrated Logistics Operational Model for Green-Supply Chain Management , 2005 .

[24]  Reza Tavakkoli-Moghaddam,et al.  Two fuzzy possibilistic bi-objective zero-one programming models for outsourcing the equipment maintenance problem , 2012 .

[25]  Mir Saman Pishvaee,et al.  A memetic algorithm for bi-objective integrated forward/reverse logistics network design , 2010, Comput. Oper. Res..

[26]  G. H. Huang,et al.  A fuzzy-stochastic robust programming model for regional air quality management under uncertainty , 2003 .

[27]  Jacqueline M. Bloemhof-Ruwaard,et al.  THE IMPACT OF PRODUCT RECOVERY ON LOGISTICS NETWORK DESIGN , 2001 .

[28]  Risto Lahdelma,et al.  Fuzzy chance constrained linear programming model for optimizing the scrap charge in steel production , 2008, Eur. J. Oper. Res..

[29]  C. Hwang,et al.  A new approach to some possibilistic linear programming problems , 1992 .

[30]  Alain Martel,et al.  The design of robust value-creating supply chain networks , 2010, Eur. J. Oper. Res..

[31]  Gerald W. Evans,et al.  A bi-objective reverse logistics network analysis for post-sale service , 2008, Comput. Oper. Res..

[32]  R. Dekker,et al.  Reverse logistics : quantitative models for closed-loop supply chains , 2004 .

[33]  Reza Tavakkoli-Moghaddam,et al.  Fuzzy Possibilistic Modeling for Closed Loop Recycling Collection Networks , 2012, Environmental Modeling & Assessment.

[34]  Guohe Huang,et al.  A Genetic-Algorithm-Aided Stochastic Optimization Model for Regional Air Quality Management under Uncertainty , 2010, Journal of the Air & Waste Management Association.

[35]  Ni-Bin Chang,et al.  Solid waste management in European countries: a review of systems analysis techniques. , 2011, Journal of environmental management.

[36]  Ni-Bin Chang,et al.  Empowering Systems Analysis for Solid Waste Management: Challenges, Trends, and Perspectives , 2011 .

[37]  Reynaldo Cruz-Rivera,et al.  Production , Manufacturing and Logistics Reverse logistics network design for the collection of End-of-Life Vehicles in Mexico , 2009 .

[38]  Ovidiu Listes,et al.  A generic stochastic model for supply-and-return network design , 2007, Comput. Oper. Res..

[39]  Li He,et al.  An inexact reverse logistics model for municipal solid waste management systems. , 2011, Journal of environmental management.

[40]  Der-Horng Lee,et al.  The Design of Sustainable Logistics Network Under Uncertainty , 2010 .

[41]  Mohammad Karamouz,et al.  A stochastic conflict resolution model for water quality management in reservoir–river systems , 2007 .

[42]  Son-Lin Nie,et al.  A two-stage fuzzy robust integer programming approach for capacity planning of environmental management systems , 2008, Eur. J. Oper. Res..

[43]  Nico Vandaele,et al.  Reverse logistics network design with stochastic lead times , 2007, Comput. Oper. Res..

[44]  Jo van Nunen,et al.  Special Section: Closed-Loop Supply Chains: Practice and Potential: Integrating Closed-Loop Supply Chains and Spare-Parts Management at IBM , 2002, Interfaces.