An ISM, DEI, and ANP based approach for product family development
暂无分享,去创建一个
Shih-Wen Hsiao | Chi-Hung Lo | Ya-Chuan Ko | Shih-Ho Chen | Shih-Wen Hsiao | Ya-Chuan Ko | Chi-Hung Lo | Shi Chen
[1] John N. Warfield,et al. Binary Matrices in System Modeling , 1973, IEEE Trans. Syst. Man Cybern..
[2] John N. Warfield,et al. On Arranging Elements of a Hierarchy in Graphic Form , 1973, IEEE Trans. Syst. Man Cybern..
[3] John N. Warfield,et al. Toward Interpretation of Complex Structural Models , 1974, IEEE Trans. Syst. Man Cybern..
[4] John N. Warfield,et al. Developing Interconnection Matrices in Structural Modeling , 1974, IEEE Trans. Syst. Man Cybern..
[5] D. W. Malone,et al. An introduction to the application of interpretive structural modeling , 1975, Proceedings of the IEEE.
[6] John N. Warfield,et al. Crossing Theory and Hierarchy Mapping , 1977, IEEE Transactions on Systems, Man, and Cybernetics.
[7] John N. Warfield,et al. SOCIETAL SYSTEMS Planning, Policy and Complexity , 1978 .
[8] M. Amagasa,et al. Structural modeling in a class of systems using fuzzy sets theory , 1977, 1977 IEEE Conference on Decision and Control including the 16th Symposium on Adaptive Processes and A Special Symposium on Fuzzy Set Theory and Applications.
[9] John N. Warfield. Some Principles of Knowledge Organization , 1979, IEEE Transactions on Systems, Man, and Cybernetics.
[10] T. Saaty,et al. The Analytic Hierarchy Process , 1985 .
[11] John N. Warfield,et al. A Science of Generic Design: Managing Complexity Through Systems Design , 1994 .
[12] Sushil,et al. The objectives of waste management in India: A futures inquiry , 1995 .
[13] Thomas L. Saaty,et al. Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .
[14] F. Dweiri. Fuzzy development of crisp activity relationship charts for facilities layout , 1999 .
[15] T. Kitamura. A computer-aided approach to the structural analysis and modification of a large circulatory system model , 1999, IEEE Transactions on Biomedical Engineering.
[16] Sanchoy K. Das,et al. An approach for estimating the end-of-life product disassembly effort and cost , 2000 .
[17] Kikuo Fujita,et al. Product variety optimization under modular architecture , 2002, Comput. Aided Des..
[18] Chian-Son Yu,et al. A GP-AHP method for solving group decision-making fuzzy AHP problems , 2002, Comput. Oper. Res..
[19] Sevin Sozer,et al. Product planning in quality function deployment using a combined analytic network process and goal programming approach , 2003 .
[20] Ingoo Han,et al. Prioritization and selection of intellectual capital measurement indicators using analytic hierarchy process for the mobile telecommunications industry , 2004, Expert Syst. Appl..
[21] Wen Lea Pearn,et al. Product Mix Optimization for Semiconductor Manufacturing Based on AHP and ANP Analysis , 2005 .
[22] Jih-Jeng Huang,et al. Multidimensional data in multidimensional scaling using the analytic network process , 2005, Pattern Recognit. Lett..
[23] Eric W. T. Ngai,et al. Evaluation of knowledge management tools using AHP , 2005, Expert Syst. Appl..
[24] Elim Liu,et al. A structural component-based approach for designing product family , 2005, Comput. Ind..
[25] Fredrik Elgh,et al. A Transparent Design System for Iterative Product Development , 2006, J. Comput. Inf. Sci. Eng..
[26] Anders Claesson. A Configurable Component Framework Supporting Platform-Based Product Development , 2006 .
[27] Shih-Wen Hsiao,et al. ANP-GP approach for product variety design , 2006 .
[28] A. J. Dentsoras,et al. Integration of fuzzy logic, genetic algorithms and neural networks in collaborative parametric design , 2006, Adv. Eng. Informatics.
[29] Ahmet Beskese,et al. Prioritization of organizational capital measurement indicators using fuzzy AHP , 2007, Int. J. Approx. Reason..
[30] R. Shankar,et al. Modeling agility of supply chain , 2007 .
[31] He-Yau Kang,et al. Priority mix planning for semiconductor fabrication by fuzzy AHP ranking , 2007, Expert Syst. Appl..
[32] Fredrik Elgh,et al. Concurrent cost estimation as a tool for enhanced producibility—System development and applicability for producibility studies , 2007 .
[33] Hsing Hung Chen,et al. Prioritization and operations NPD mix in a network with strategic partners under uncertainty , 2007, Expert Syst. Appl..
[34] Reza Tavakkoli-Moghaddam,et al. Make-to-order or make-to-stock decision by a novel hybrid approach , 2008, Adv. Eng. Informatics.
[35] Ronghua Xu,et al. Product design knowledge management based on design structure matrix , 2008, 2008 12th International Conference on Computer Supported Cooperative Work in Design.
[36] Huan Neng Chiu,et al. Vendor selection by integrated fuzzy MCDM techniques with independent and interdependent relationships , 2008, Inf. Sci..
[37] Fredrik Elgh,et al. Supporting management and maintenance of manufacturing knowledge in design automation systems , 2008, Adv. Eng. Informatics.
[38] Yu-Cheng Lee,et al. Structural approach to design user interface , 2010, Comput. Ind..
[39] Amy H. I. Lee,et al. An evaluation framework for technology transfer of new equipment in high technology industry , 2010 .
[40] Murray Turoff,et al. Scenario construction via Delphi and cross-impact analysis , 2011 .