A Mathematical Model for Production Planning and Scheduling in a Production System: A Case Study

Integration in decision making at different organizational and time levels has important implications for increasing the profitability of organizations. Among the important issues of medium-term decision-making in factories, are production planning problems that seek to determine the quantities of products produced in the medium term and the allocation of corporate resources. Furthermore, at short-term, jobs scheduling and timely delivery of orders is one of the vital decision-making issues in each workshop. In this paper, the production planning and scheduling problem in a factory in the north of Iran is considered as a case study. The factory produces cans and bins in different types with ten production lines. Therefore, a mixed integer linear programming (MILP) model is presented for the integrated production planning and scheduling problem to maximize profit. The proposed model is implemented in the GAMS software with the collected data from the real environment, and the optimal scheduling and production planning for the system is presented.

[1]  Marianthi G. Ierapetritou,et al.  Production planning and scheduling integration through augmented Lagrangian optimization , 2010, Comput. Chem. Eng..

[2]  Hartmut Stadtler Production Planning and Scheduling , 2015 .

[3]  Alistair Clark,et al.  A novel flexible model for lot sizing and scheduling with non-triangular, period overlapping and carryover setups in different machine configurations , 2018 .

[4]  Bernardo Almada-Lobo,et al.  Lot sizing and scheduling: industrial extensions and research opportunities , 2011 .

[5]  Young Hoon Lee,et al.  Synchronized production planning and scheduling in semiconductor fabrication , 2016, Comput. Ind. Eng..

[6]  Hong-Sen Yan,et al.  Integrated production planning and scheduling for a mixed batch job-shop based on alternant iterative genetic algorithm , 2015, J. Oper. Res. Soc..

[7]  A.A. Rodriguez,et al.  Hierarchical modeling and control of re-entrant semiconductor manufacturing facilities , 1996, Proceedings of 35th IEEE Conference on Decision and Control.

[8]  Iftekhar A. Karimi,et al.  Integrated campaign planning and resource allocation in batch plants , 2011, Comput. Chem. Eng..

[9]  Diwakar Gupta,et al.  The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times , 2005, Comput. Oper. Res..

[10]  Donald E. Shobrys,et al.  Planning, scheduling and control systems: why cannot they work together , 2000 .

[11]  Tamás Kis,et al.  A cutting plane approach for integrated planning and scheduling , 2012, Comput. Oper. Res..

[12]  Herbert Meyr,et al.  Simultaneous lotsizing and scheduling by combining local search with dual reoptimization , 2000, Eur. J. Oper. Res..

[13]  Joanna Józefowska,et al.  Optimization tool for short-term production planning and scheduling , 2008 .

[14]  Nilay Shah Process industry supply chains: Advances and challenges , 2004 .

[15]  Alistair R. Clark,et al.  Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups , 2011, J. Sched..

[16]  Costas D. Maranas,et al.  Multiperiod Planning and Scheduling of Multiproduct Batch Plants under Demand Uncertainty , 1997 .

[17]  Maria Antónia Carravilla,et al.  A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times , 2008, Comput. Oper. Res..

[18]  Geraldo Robson Mateus,et al.  A branch and price algorithm to solve the integrated production planning and scheduling in bulk ports , 2017, Eur. J. Oper. Res..

[19]  In-Jae Jeong,et al.  A two-level method of production planning and scheduling for bi-objective reentrant hybrid flow shops , 2017, Comput. Ind. Eng..

[20]  Yanina Fumero,et al.  A multiproduct batch plant design model incorporating production planning and scheduling decisions under a multiperiod scenario , 2016 .

[21]  Diego Klabjan,et al.  Modeling lotsizing and scheduling problems with sequence dependent setups , 2014, Eur. J. Oper. Res..

[22]  Zeger Degraeve,et al.  Modeling industrial lot sizing problems: a review , 2008 .

[23]  Stéphane Dauzère-Pérès,et al.  A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem , 2015, Eur. J. Oper. Res..

[24]  Peter M. Verderame,et al.  Integrated Operational Planning and Medium-Term Scheduling for Large-Scale Industrial Batch Plants , 2008 .

[25]  Christos T. Maravelias,et al.  Integration of production planning and scheduling: Overview, challenges and opportunities , 2009, Comput. Chem. Eng..

[26]  Zhengyang Hu,et al.  A multi-stage stochastic programming for lot-sizing and scheduling under demand uncertainty , 2018, Comput. Ind. Eng..