Partial hinge detailing to improve catenary action of reinforced concrete frames
暂无分享,去创建一个
Kang Hai Tan | Jun Yu | K. Tan | Ju Yu
[1] Mehrdad Sasani,et al. Progressive collapse analysis of an RC structure , 2008 .
[2] Yan Xiao,et al. Experimental Study on Progressive Collapse-Resistant Behavior of Reinforced Concrete Frame Structures , 2008 .
[3] Youpo Su,et al. Progressive Collapse Resistance of Axially-Restrained Frame Beams , 2009 .
[4] Jun Yu,et al. Experimental study on catenary action of RC beam-column subassemblages , 2010 .
[5] Jinkoo Kim,et al. Progressive collapse-resisting capacity of RC beam–column sub-assemblage , 2011 .
[6] Fahim Sadek,et al. Testing and Analysis of Steel and Concrete Beam-Column Assemblies under a Column Removal Scenario , 2011 .
[7] Kang Hai Tan,et al. Experimental and numerical investigation on progressive collapse resistance of reinforced concrete beam column sub-assemblages , 2013 .
[8] Kang Hai Tan,et al. Structural Behavior of RC Beam-Column Subassemblages under a Middle Column Removal Scenario , 2013 .
[9] K. Tan,et al. STRUCTURAL BEHAVIOR OF REINFORCED CONCRETE BEAMCOLUMN SUB-ASSEMBLAGES UNDER A MIDDLE COLUMN REMOVAL SCENARIO , 2013 .