Petri net modeling and one-wafer scheduling of single-arm tree-like multi-cluster tools

It is very challenging to obtain a one-wafer cyclic schedule for the widely used multi-cluster tools in semiconductor manufacturing. This work studies the scheduling problem for a single-arm tree-like multi-cluster tool that is process-dominant. A resource-oriented Petri net (PN) model is developed to describe its operation behavior by explicitly modeling robot waiting. Based on it, sufficient and necessary conditions are for the first time established to find a one-wafer periodic schedule. By determining robot waiting time, efficient algorithms are proposed to find such a schedule with the minimal cycle time. An example is used to show its application.

[1]  Wai Kin Chan,et al.  Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part I: Two-Cluster Analysis , 2011, IEEE Transactions on Automation Science and Engineering.

[2]  Shengwei Ding,et al.  Steady-State Throughput and Scheduling Analysis of Multi-Cluster Tools for Semiconductor Manufacturing: A Decomposition Approach , 2005, Proceedings of the 2005 IEEE International Conference on Robotics and Automation.

[3]  Bing-Hai Zhou,et al.  Modelling and scheduling analysis of multi-cluster tools with residency constraints based on time constraint sets , 2013 .

[4]  MengChu Zhou,et al.  Petri Net-Based Optimal One-Wafer Scheduling of Single-Arm Multi-Cluster Tools in Semiconductor Manufacturing , 2013, IEEE Transactions on Semiconductor Manufacturing.

[5]  Shengwei Ding,et al.  Steady-State Throughput and Scheduling Analysis of Multicluster Tools: A Decomposition Approach , 2008, IEEE Transactions on Automation Science and Engineering.

[6]  Feng Chu,et al.  A Petri Net Method for Schedulability and Scheduling Problems in Single-Arm Cluster Tools With Wafer Residency Time Constraints , 2008, IEEE Transactions on Semiconductor Manufacturing.

[7]  Wai Kin Chan,et al.  Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part II: Tree-Like Topology Configurations , 2011, IEEE Transactions on Automation Science and Engineering.

[8]  Tae-Eog Lee,et al.  Scheduling analysis of time-constrained dual-armed cluster tools , 2003 .

[9]  Chelliah Sriskandarajah,et al.  Scheduling Dual Gripper Robotic Cell: One-Unit Cycles , 2006, Eur. J. Oper. Res..

[10]  MengChu Zhou,et al.  Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A Petri net approach , 1998 .

[11]  MengChu Zhou,et al.  Optimal one-wafer cyclic scheduling analysis of hybrid multi-cluster tools with one-space buffering module , 2014, 2014 IEEE International Conference on Robotics and Automation (ICRA).

[12]  Shengwei Ding,et al.  Multicluster tools scheduling: an integrated event graph and network model approach , 2006, IEEE Transactions on Semiconductor Manufacturing.

[13]  MengChu Zhou,et al.  Scheduling of Single-Arm Multi-cluster Tools With Wafer Residency Time Constraints in Semiconductor Manufacturing , 2015, IEEE Transactions on Semiconductor Manufacturing.

[14]  M. Omizo,et al.  Modeling , 1983, Encyclopedic Dictionary of Archaeology.