A pull/push concept for toolgroup workload balance in wafer fab
暂无分享,去创建一个
In this paper, a pull/push concept is proposed in order to balance toolgroup workload in a wafer fab. This is accomplished by using a so-called WIP Control Table. Each upstream toolgroup maintains a WIP Control Table which contains current WIP information of downstream toolgroups such as target WIP, actual WIP and WIP difference. In case of lot move in/out and tool status change, the WIP Control Table is updated. Therefore, the upstream toolgroup is able to detect WIP distribution and pull request of downstream toolgroups dynamically, then push optimal lots with consideration of lot status and local tool constraint to the downstream toolgroup which runs short of WIP. The simulation results demonstrate that the proposed pull/push concept is superior over First-in-First-out (FIFO) and Operation Due Date (ODD) with regard to average cycle time and on time delivery.
[1] Shu Li,et al. Minimum inventory variability schedule with applications in semiconductor fabrication , 1996 .
[2] John W. Fowler,et al. A new scheduling approach using combined dispatching criteria in wafer fabs , 2003 .
[3] Oliver Rose. Comparison of Due-date Oriented Dispatch Rules in Semiconductor Manufacturing , 2003 .
[4] John W. Fowler,et al. Measurement and improvement of manufacturing capacities (MIMAC): Final report , 1995 .