Optimization of truck-loader haulage systems in an underground mine using simulation methods

Abstract This study developed a program to simulate a haulage system with trucks and loaders for an underground mine using the GPSS/H simulation language. The Daesung MDI limestone mine located in Korea was selected as the study area. Using the developed program and parameter values determined by a field survey, simulations of the truck-loader haulage system were performed to optimize the number of trucks dispatched at three loading points in the study area. The simulation results showed that maximum production can be expected by dispatching four, seven, and three trucks to each loading point, respectively. Because the developed program was found to properly simulate the haulage system, it could be used for practical purposes in the study area.

[1]  Yosoon Choi Simulation of Shovel-Truck Haulage Systems by Considering Truck Dispatch Methods , 2013 .

[2]  Kazem Oraee,et al.  Fuzzy Model for Truck Allocation in Surface Mines , 2004 .

[3]  Hong Zhang Multi-objective simulation-optimization for earthmoving operations , 2008 .

[4]  Yosoon Choi,et al.  Simulation of Shovel-Truck Haulage Systems in Open-pit Mines by Considering Breakdown of Trucks and Crusher Capacity , 2014 .

[5]  Jenny Greberg,et al.  Optimization of Truck-Loader haulage system in an underground mine: A simulation approach using SimMine , 2012 .

[6]  John R. Sturgul,et al.  Mine Design: Examples Using Simulation , 1999 .

[7]  Michel Gamache,et al.  Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit Mines , 2001 .

[8]  Yosoon Choi,et al.  Simulation of Truck-Loader Haulage Systems in an Underground Mine using GPSS/H , 2014 .

[9]  Victor Amoako Temeng,et al.  A computerized model for truck dispatching in open pit mines , 1997 .

[10]  Atac Bascetin,et al.  Optimization of shovel-truck system for surface mining , 2009 .

[11]  T. Novak,et al.  Comparative performance study of diesel and electric face-haulage vehicles , 1987 .

[12]  Shangyao Yan,et al.  An optimal scheduling model for ready mixed concrete supply with overtime considerations , 2007 .

[13]  G. H. Blackwell Estimation of large open pit haulage truck requirements , 1999 .

[14]  Yosoon Choi,et al.  Development of a Windows-based Simulation Program for Selecting Equipments in Open-pit Shovel-Truck Haulage Systems , 2014 .

[15]  Håkan Schunnesson,et al.  The use of discrete event simulation for underground haulage mining equipment selection , 2014 .

[16]  Sirpa Mäki,et al.  The computer program , 1980 .

[17]  C. Musingwini,et al.  Modelling open pit shovel-truck systems using the Machine Repair Model , 2007 .