GAS TURBINE ENGINE PRODUCTION IMPLEMENTATION STUDY. VOLUME I: EXECUTIVE SUMMARY
暂无分享,去创建一个
THE REPORT PRESENTS AN ASSESSMENT OF AVAILABLE INFORMATION PERTAINING TO IMPLEMENTING MASS PRODUCTION OF GAS TURBINE POWERED AUTOMOBILES. THE STATUS OF THE TECHNOLOGY AND IMPLEMENTATION SCHEDULE VISIBILITY REPORTED HEREIN IS THAT EXISTING AT THE TIME OF DATA ACQUISITION VISITS MADE TO SELECTED FIRMS AND AGENCIES DURING THE PERIOD FEBRUARY 28 THROUGH APRIL 30, 1973. THE RESULTS OF THIS STUDY ARE PRESENTED IN TWO VOLUMES. VOLUME I, THE EXECUTIVE SUMMARY, PRESENTS A REVIEW OF IMPORTANT FINDINGS AND CONCLUSIONS IN THE HIGHLIGHTS AND SUMMARY SECTIONS. /NTIS/