Rail infrastructure costing based on multi-level full cost allocation

Due to charging issues costs of rail infrastructure use shall be determined as exactly as possible. At the same time rail infrastructure management is a very complex system characterised by a high ratio of indirect costs. There are several costing methods used in transport and logistics but none of them gives a transparent and traceable solution for allocating indirect costs. That is why the paper aims to elaborate a transport cost calculation model adopting and utilising the multi-level full cost allocation method. The developed model and the calculation process are specified for rail infrastructure management. The new cost calculation system delivers more reliable and accurate cost data of elementary rail infrastructure services by allocating indirect costs on a cause-effect basis. At the same time additional resources may be needed for the implementation of the model. Nevertheless, as rail infrastructure manager companies request more exact cost data they should consider the implementation of the proposed costing model.

[1]  Binshan Lin,et al.  Supply chain costing: an activity‐based perspective , 2001 .

[2]  Heike Link,et al.  Transport accounts—methodological concepts and empirical results , 2005 .

[3]  K. Cubukcu Examining the cost structure of urban bus transit industry: does urban geography help? ☆ , 2008 .

[4]  W. Wodchis Applying Activity-Based Costing in Long Term Care , 1998, Healthcare management forum.

[5]  Jori Uusitalo,et al.  Applying the activity-based costing to cut-to-length timber harvesting and trucking. , 2009 .

[6]  Saeed Askary,et al.  Supply Chain Management, Activity-Based Costing and Organisational Factors , 2009 .

[7]  Mikael Rönnqvist,et al.  Cost Allocation in Collaborative Forest Transportation , 2006, Eur. J. Oper. Res..

[8]  Adil Baykasoğlu,et al.  Application of activity-based costing to a land transportation company: A case study , 2008 .

[9]  Zoltán Bokor Improving Transport Costing by using Operation Modeling , 2011 .

[10]  Wenxing Li,et al.  Analysis on Cost of Urban Rail Transit , 2012 .

[11]  R. Kaplan Activity-based management , 1993 .

[12]  Kuang Yu Application of Activity Based Costing in China , 2004 .

[13]  Zoltán Bokor,et al.  Integrating Logistics Cost Calculation into Production Costing , 2012 .

[14]  Stefan Seuring,et al.  Applying activity-based costing in a supply chain environment , 2012 .

[15]  Murat Gunduz,et al.  Parametric cost estimation system for light rail transit and metro trackworks , 2011, Expert Syst. Appl..

[16]  Katalin Tánczos,et al.  PROBLEMS AND ISSUES OF DEFINING USER CHARGES FOR RAILWAY INFRASTRUCTURE , 2001 .

[17]  Timo Pirttilä,et al.  Activity-based costing and distribution logistics management , 1995 .

[18]  Klavdij Logožar,et al.  Activity-based Management of Logistic Costs in a Manufacturing Company: A Case of Increased Visibility of Logistics Costs in a Slovenian Paper Manufacturing Company , 2012 .

[19]  Zoltán Bokor,et al.  Elaborating Cost and Performance Management Methods in Transport , 2009 .

[20]  Wen-Cheng Lin Financial performance and customer service: An examination using activity-based costing of 38 international airlines , 2012 .

[21]  Chris Nash,et al.  Rail Infrastructure Charges in Europe , 2005 .

[22]  Zoltán Bokor Calculation model for transport costing , 2011 .

[23]  Carles Gríful-Miquela,et al.  Activity-based costing methodology for third-party logistics companies , 2001 .

[24]  F. Calvo,et al.  Are rail charges connected to costs , 2012 .

[25]  Randolph R. Resor,et al.  Allocating Track Maintenance Costs on Shared Rail Facilities , 2002 .