Quantitative approaches in production management

Production Management is still a fast developing application area in Operations Research. Industry 4.0, Digitalization, Smart Factory, Big Data, the Internet of Things and the ongoing trend in production automation and customization of products lead to new emerging challenges and opportunities for OR researchers to develop appropriate analytical approaches for production management. The objective of this special issue is to accelerate the development and application of quantitative approaches for problem-solving and decision-making in manufacturing, its supporting areas and the associated supply chains considering these newly emerging challenges. The special issue will present contributions dealing with quantitative methods and applications for the manufacturing industry with a special focus on multi-level production structures and planning systems, scarce resources, as well as stochastic and/or dynamic modeling approaches. This also includes approaches supporting real-time decision making. Topics that are of interest for this special issue include but are not limited to:  Design of Manufacturing Systems: Flexible Production Systems, Flow Lines, Cellular and Job Shop Production Systems  Performance Analysis of Production Systems  Make-to-Order and Make-to-Stock Production Concepts  Hierarchical Production Planning Systems and Advanced Planning  Production Planning and Control: Capacitated Master Production Scheduling, Lot Sizing  Integrated Procurement and Production Planning  Integrated Production and Distribution Planning  Control of Material Flow: Production Authorization Systems, ConWIP, Kanban  Inventory Management: Safety Stock Allocation, Lead Time Control, Performance Measures of Inventory Systems

[1]  Richard Pibernik,et al.  Allocation planning in sales hierarchies with stochastic demand and service-level targets , 2018, OR Spectr..

[2]  Horst Tempelmeier Safety stock allocation in a two-echelon distribution system , 1993 .

[3]  Horst Tempelmeier,et al.  A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures , 1994 .

[4]  Horst Tempelmeier,et al.  Performance analysis of closed-loop assembly lines with general processing times and finite buffer spaces , 2013 .

[5]  Horst Tempelmeier,et al.  Dynamic uncapacitated lot sizing with random demand under a fillrate constraint , 2011, Eur. J. Oper. Res..

[6]  Horst Tempelmeier,et al.  Resource-constrained materials requirements planning- MRP rc , 1997 .

[7]  Horst Tempelmeier,et al.  Capacitated dynamic production and remanufacturing planning under demand and return uncertainty , 2016, OR Spectr..

[8]  Horst Tempelmeier A multi-level inventory system with a make-to-order supplier , 2013 .

[9]  Horst Tempelmeier Inventory service-levels in the customer supply chain , 2000, OR Spectr..

[10]  Horst Tempelmeier,et al.  Performance evaluation of unbalanced flow lines with general distributed processing times, failures and imperfect production , 2001 .

[11]  Horst Tempelmeier,et al.  Stochastic Lot Sizing Problems , 2013 .

[12]  Horst Tempelmeier,et al.  Supply chain inventory optimization with two customer classes in discrete time , 2006, Eur. J. Oper. Res..

[13]  Horst Tempelmeier,et al.  Practical considerations in the optimization of flow production systems , 2003 .

[14]  Horst Tempelmeier,et al.  Simultaneous lotsizing and scheduling problems: a classification and review of models , 2017, OR Spectr..

[15]  Horst Tempelmeier,et al.  Inventory control using a service constraint on the expected customer order waiting time , 1985 .

[16]  Barış Tan Production Control with Price, Cost, and Demand Uncertainty , 2019, OR Spectr..

[17]  Horst Tempelmeier,et al.  Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource , 2008 .

[18]  Horst Tempelmeier,et al.  Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic , 2009, Comput. Oper. Res..

[19]  Horst Tempelmeier,et al.  ABC β–a heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint , 2010 .

[20]  Horst Tempelmeier,et al.  A SIMPLE HEURISTIC FOR DYNAMIC ORDER SIZING AND SUPPLIER SELECTION WITH TIME‐VARYING DATA , 2009 .

[21]  Dirk Briskorn,et al.  A cyclic production scheme for the synchronized and integrated two-level lot-sizing and scheduling problem with no-wait restrictions and stochastic demand , 2019, OR Spectr..

[22]  Horst Tempelmeier,et al.  On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints , 2007, Eur. J. Oper. Res..

[23]  Horst Tempelmeier,et al.  A procedure for the approximation of the waiting time distribution in a discrete-time (r, S) inventory system , 2018, Int. J. Prod. Res..

[24]  Heinrich Kuhn,et al.  Flexible Manufacturing Systems: Decision Support for Design and Operation , 1993 .

[25]  Horst Tempelmeier,et al.  Linear programming models for a stochastic dynamic capacitated lot sizing problem , 2015, Comput. Oper. Res..

[26]  Horst Tempelmeier,et al.  Approximation of the probability distribution of the customer waiting time under an (r, s, q) inventory policy in discrete time , 2010 .

[27]  Heinrich Kuhn,et al.  OR-Modelle zur Planung flexibler Fertigungssysteme Ein Überblick , 1992 .

[28]  Hartmut Stadtler,et al.  Model formulations for the capacitated lot-sizing problem with service-level constraints , 2019, OR Spectr..

[29]  R. Lackes,et al.  Supply chain management and reverse logistics , 2004 .

[30]  Tullio Tolio,et al.  New developments in stochastic models of manufacturing and service operations , 2016 .

[31]  H. Tempelmeier,et al.  A Lagrangean-based heuristic for dynamic multilevel multiitem constrained lotsizing with setup times , 1996 .

[32]  H. Tempelmeier A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint , 2011 .

[33]  Richard F. Hartl,et al.  A machine learning approach for flow shop scheduling problems with alternative resources, sequence-dependent setup times, and blocking , 2019, OR Spectrum.

[34]  Horst Tempelmeier,et al.  Performance evaluation of flexible manufacturing systems with blocking , 1989 .

[35]  Richard F. Hartl,et al.  Supply chain dynamics, control and disruption management , 2016 .

[36]  Horst Tempelmeier,et al.  Integrated optimization of safety stock and transportation capacity , 2015, Eur. J. Oper. Res..

[37]  Martin Grunow,et al.  Flexible layouts for the mixed-model assembly of heterogeneous vehicles , 2019, OR Spectr..

[38]  Horst Tempelmeier,et al.  Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator , 2016, OR Spectr..

[39]  Horst Tempelmeier,et al.  A heuristic for the dynamic multi-level capacitated lotsizing problem with linked lotsizes for general product structures , 2009, OR Spectr..

[40]  Horst Tempelmeier,et al.  The variance of inter-departure times of the output of an assembly line with finite buffers, converging flow of material, and general service times , 2012, OR Spectr..