The status of lean implementation within South African aircraft maintenance organisations

Globally, the implementation of Lean techniques has proven to be successful in improving quality while reducing turnaround times and costs within aircraft maintenance organisations (AMOs), including those organisations that are of a competitive threat to South African companies. Limited research has been conducted on Lean implementation in South African AMOs, leading to the motivation for this study: to determine the status of Lean implementation within South African AMOs. Quantitative and qualitative data were derived from interviews with senior management from a sample of Gauteng-based organisations. The results provided an indication of both their understanding and the status of Lean within their organisations.

[1]  Mike Rother,et al.  Toyota Kata: Managing People for Improvement, Adaptiveness and Superior Results , 2009 .

[2]  J. Liker The Toyota Way , 2003 .

[3]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[4]  Keebom Kang,et al.  Lean Six Sigma Implementation for Military Logistics to Improve Readiness , 2007 .

[5]  D. Remenyi,et al.  Research supervision for supervisors and their students , 2004 .

[6]  Roger Lyon,et al.  Advanced Subsonic Airplane Design and Economic Studies , 1995 .

[7]  Pius Achanga,et al.  Critical success factors for lean implementation within SMEs , 2006 .

[8]  A. Bryman Social Research Methods , 2001 .

[9]  William M. K. Trochim,et al.  Concept Mapping as an Alternative Approach for the Analysis of Open-Ended Survey Responses , 2002 .

[10]  S. Spear,et al.  Decoding the DNA of the Toyota Production System , 1999 .

[11]  A. James 2010 , 2011, Philo of Alexandria: an Annotated Bibliography 2007-2016.

[12]  J. Moubray Reliability-centred maintenance , 1995 .

[13]  Dennis F. X. Mathaisel,et al.  A lean architecture for transforming the aerospace maintenance, repair and overhaul (MRO) enterprise , 2005 .

[14]  Peter D. Wickens The Ascendant Organisation , 1995 .

[15]  William F. Christopher,et al.  Handbook for Productivity Measurement and Improvement , 1993 .

[16]  D. H. Middleton,et al.  Aircraft Maintenance Management Part 3 , 1993 .

[17]  R. Yin Case Study Research: Design and Methods , 1984 .

[18]  Marvin Rausand,et al.  Reliability Centred Maintenance , 2008 .

[19]  Peter M O'Rourke,et al.  A Multiple-Case Analysis of Lean Six Sigma Deployment and Implementation Strategies , 2012 .

[20]  Kirkor Bozdogan,et al.  Towards An Integration Of The Lean Enterprise System, Total Quality Management, Six Sigma And Related Enterprise Process Improvement Methods , 2010 .

[21]  L. Dooley Case Study Research and Theory Building , 2002 .

[22]  Dennis F.X. Mathaisel,et al.  A Lean Sustainment Enterprise Model for Military Systems , 2002 .