Implementation of Waste Minimization at a complex R&D site

Under the 1994 Waste Minimization/Pollution Prevention Crosscut Plan, the Department of Energy (DOE) has set a goal of 50% reduction in waste at its facilities by the end of 1999. Each DOE site is required to set site-specific goals to reduce generation of all types of waste including hazardous, radioactive, and mixed. To meet these goals, Argonne National Laboratory (ANL), Argonne, IL, has developed and implemented a comprehensive Pollution Prevention/Waste Minimization (PP/WMin) Program. The facilities and activities at the site vary from research into basic sciences and research into nuclear fuel cycle to high energy physics and decontamination and decommissioning projects. As a multidisciplinary R&D facility and a multiactivity site, ANL generates waste streams that are varied, in physical form as well as in chemical constituents. This in turn presents a significant challenge to put a cohesive site-wide PP/WMin Program into action. In this paper, we will describe ANL`s key activities and waste streams, the regulatory drivers for waste minimization, and the DOE goals in this area, and we will discuss ANL`s strategy for waste minimization and it`s implementation across the site.