Resource loading under uncertainty

The objective of this research is to develop resource loading methods that can deal with ETO inherent uncertainties.

[1]  J. Huisman The Netherlands , 1996, The Lancet.

[2]  R. Anthony,et al.  Planning and Control Systems: A Framework for Analysis , 1965 .

[3]  Antonio Lova,et al.  Combining Random Sampling and Backward-Forward heuristics for Resource-Constrained Multi-Project Scheduling , 2002 .

[4]  Robert L. Armacost,et al.  The role of the nonanticipativity constraint in commercial software for stochastic project scheduling , 1996 .

[5]  Gabriel R. Bitran,et al.  Hierarchical production planning , 1989 .

[6]  Lowell Dye Managing multiple projects : planning, scheduling, and allocating resources for competitive advantage , 2002 .

[7]  Kum Khiong Yang,et al.  A comparison of resource allocation and activity scheduling rules in a dynamic multi-project environment , 1993 .

[8]  J. Rosenhead,et al.  Robustness and Optimality as Criteria for Strategic Decisions , 1972 .

[9]  Paolo Brandimarte Exploiting process plan flexibility in production scheduling: A multi-objective approach , 1999, Eur. J. Oper. Res..

[10]  Ibrahim S. Kurtulus,et al.  Multiproject scheduling: Analysis of scheduling strategies under unequal delay penalties , 1985 .

[11]  Xiaoqiang Cai,et al.  Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs , 1999 .

[12]  I. Kurtulus,et al.  Multi-Project Scheduling: Categorization of Heuristic Rules Performance , 1982 .

[13]  H. Wiendahl Die belastungsorientierte Fertigungssteuerung , 1992 .

[14]  Brian G. Kingsman,et al.  The effect of workload control (WLC) on performance in make-to-order companies , 1998 .

[15]  Carlo Vercellis,et al.  Hierarchical models for multi-project planning and scheduling , 1993 .

[16]  Rolf H. Möhring,et al.  Scheduling under Uncertainty: Bounding the Makespan Distribution , 2001, Computational Discrete Mathematics.

[17]  Arnoldo C. Hax,et al.  Production and inventory management , 1983 .

[18]  Erwin W. Hans,et al.  Robust resource loading for engineer-to-order manufacturing , 2004 .

[19]  Dimitri Golenko-Ginzburg,et al.  Stochastic network project scheduling with non-consumable limited resources , 1997 .

[20]  Aaron J. Shenhar,et al.  One Size Does Not Fit All Projects: Exploring Classical Contingency Domains , 2001, Manag. Sci..

[21]  R. Kapuściński,et al.  Dynamic Capacity Reservation in a Make-to-Order Environment , 2000 .

[22]  J. Mulvey,et al.  Making a case for robust optimization models , 1997 .

[23]  Robert W. Grubbström,et al.  Planning and replanning the master production schedule under demand uncertainty , 2002 .

[24]  Robert H. Storer,et al.  Robustness Measures and Robust Scheduling for Job Shops , 1994 .

[25]  Robert H. Storer,et al.  Decomposition heuristics for robust job-shop scheduling , 1998, IEEE Trans. Robotics Autom..

[26]  J. O'Neill,et al.  Project management. , 2001, Health management technology.

[27]  Rolf H. Möhring,et al.  Scheduling under uncertainty: Optimizing against a randomizing adversary , 2000, APPROX.

[28]  Dov Dvir,et al.  Plans are nothing, changing plans is everything: the impact of changes on project success , 2004 .

[29]  Laureano F. Escudero,et al.  Production planning via scenario modelling , 1993, Ann. Oper. Res..

[30]  Whm Wenny Raaymakers,et al.  Order acceptance and capacity loading in batch process industries , 1999 .

[31]  Thomas E. Morton,et al.  Heuristic scheduling systems : with applications to production systems and project management , 1993 .

[32]  Lee J. Krajewski,et al.  Disaggregation in manufacturing and service organizations: survey of problems and research , 1977 .

[33]  K. Neumann,et al.  GERT networks and the time-oriented evaluation of projects , 1979 .

[34]  Vincent A. Mabert,et al.  Evaluating project scheduling and due date assignment procedures: an experimental analysis , 1988 .

[35]  Sacramento Quintanilla,et al.  Project Scheduling with Stochastic Activity Interruptions , 1999 .

[36]  Thomas E. Morton,et al.  Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics , 1993 .

[37]  G. Zäpfel,et al.  New concepts for production planning and control , 1993 .

[38]  William Wheeler 8 – System Architecture , 2004 .

[39]  Rainer Kolisch,et al.  Make-To-Order Assembly Management , 2000 .

[40]  Rainer Kolisch,et al.  Adaptive search for solving hard project scheduling problems , 1996 .

[41]  Mark Mathieu Theodorus Giebels,et al.  EtoPlan: a concept for concurrent manufacturing planning and control - Building holarchies for manufacture-to-order environments , 2000 .

[42]  Sooyoung Kim,et al.  Resource-Constrained Scheduling of Projects with Variable-Intensity Activities , 1990 .

[43]  M. F.,et al.  Bibliography , 1985, Experimental Gerontology.

[44]  EG Ebbe Negenman Material coordination under capacity constraints , 2000 .

[45]  Martin Land,et al.  Workload control concepts in job shops A critical assessment , 1995 .

[46]  María Pilar Tormos,et al.  A multicriteria heuristic method to improve resource allocation in multiproject scheduling , 2000, Eur. J. Oper. Res..

[47]  Jack R. Meredith,et al.  Project Management: A Managerial Approach , 1989 .

[48]  Gintaras V. Reklaitis,et al.  A framework for schedule evaluation with processing uncertainty , 1999 .

[49]  Klaus Neumann,et al.  A capacitated hierarchical approach to make-to-order production , 1998 .

[50]  D. Clay Whybark,et al.  MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .

[51]  Tamás Kis,et al.  A branch-and-cut algorithm for scheduling of projects with variable-intensity activities , 2005, Math. Program..

[52]  Robert C. Leachman,et al.  MULTI-PROJECT SCHEDULING WITH EXPLICIT LATENESS COSTS , 1993 .

[53]  Klaus Neumann,et al.  A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods , 1997 .

[54]  Edward C. Sewell,et al.  Heuristic, optimal, static, and dynamic schedules when processing times are uncertain , 1997 .

[55]  Douglas B. Bock,et al.  A Comparison of Due Date Setting, Resource Assignment, and Job Preemption Heuristics for the Multiproject Scheduling Problem* , 1990 .

[56]  A Gerodimos,et al.  Robust Discrete Optimization and its Applications , 1996, J. Oper. Res. Soc..

[57]  Stephen O. Ogunlana,et al.  Hierarchical approach to project planning: the case of a petroleum pipeline construction , 1996 .

[58]  G. Wullinka,et al.  A system architecture for holonic manufacturing planning and control ( EtoPlan ) , 2002 .

[59]  Reha Uzsoy,et al.  Executing production schedules in the face of uncertainties: A review and some future directions , 2005, Eur. J. Oper. Res..

[60]  Professor Dr. Klaus Neumann,et al.  Project Scheduling with Time Windows and Scarce Resources , 2003, Springer Berlin Heidelberg.

[61]  Arno Sprecher,et al.  A note on “hierarchical models for multi-project planning and scheduling” , 1996 .

[62]  K. Clark,et al.  Creating project plans to focus product development. , 1992, Harvard business review.

[63]  Johannes M.J. Schutten,et al.  Multi-project rough-cut capacity planning , 1998 .

[64]  Baoding Liu,et al.  Project scheduling problem with stochastic activity duration times , 2005, Appl. Math. Comput..

[65]  Frederik Stork,et al.  Stochastic resource-constrained project scheduling , 2001 .

[66]  Jonathan Rosenhead,et al.  Planning under Uncertainty: II. A Methodology for Robustness Analysis , 1980 .

[67]  Linus Schrage,et al.  OR Practice - A Scenario Approach to Capacity Planning , 1989, Oper. Res..

[68]  Gabriel R. Bitran,et al.  Hierarchical Production Planning: A Two-Stage System , 1982, Oper. Res..

[69]  Rainer Kolisch,et al.  Characterization and generation of a general class of resource-constrained project scheduling problems , 1995 .

[70]  Willy Herroelen,et al.  Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..

[71]  Erwin W. Hans,et al.  Workload based order acceptance in job shop environments , 2005, OR Spectr..

[72]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[73]  Jwm Will Bertrand,et al.  Production control and information systems for component-manufacturing shops , 1981 .

[74]  Mikkel T. Jensen,et al.  Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures , 2001, Appl. Soft Comput..

[75]  W. H. M. Zijm,et al.  Towards intelligent manufacturing planning and control systems , 2000, OR Spectr..

[76]  Subhash C. Narula,et al.  Multi-Project Scheduling: Analysis of Project Performance , 1985 .

[77]  G. Wullink *,et al.  Scenario-based approach for flexible resource loading under uncertainty , 2004 .

[78]  Erik Demeulemeester,et al.  Project scheduling : a research handbook , 2002 .

[79]  Ronald De Boer Resource-constrained multi-project management, a hierarchical decision support system , 1998 .

[80]  Willy Herroelen,et al.  The construction of stable project baseline schedules , 2004, Eur. J. Oper. Res..

[81]  李幼升,et al.  Ph , 1989 .

[82]  Jay R. Galbraith Designing Complex Organizations , 1973 .

[83]  Whm Henk Zijm,et al.  Order acceptance strategies in a production-to-order environment with setup times and due-dates , 1992 .

[84]  Sameh M. Saad,et al.  Uncertainty under MRP-planned manufacture: Review and categorization , 2002 .

[85]  Jan Węglarz,et al.  Project Scheduling with Continuously-Divisible, Doubly Constrained Resources , 1981 .

[86]  Rakesh Nagi,et al.  Hierarchical Modeling Approach for Production Planning , 1992 .

[87]  Martin W. P. Savelsbergh,et al.  Branch-and-Price: Column Generation for Solving Huge Integer Programs , 1998, Oper. Res..

[88]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[89]  V. Cristina Ivanescu,et al.  Makespan estimation and order acceptance in batch process industries when processing times are uncertain , 2002, OR Spectr..

[90]  Elias Willem Hans,et al.  Resource Loading by Branch-and-Price Techniques , 2001 .

[91]  Arnoldo C. Hax,et al.  Hierarchical integration of production planning and scheduling , 1973 .

[92]  John Dumond,et al.  In a multi-resource environment, how much is enough? , 1992 .

[93]  Teofilo F. Gonzalez,et al.  Flowshop and Jobshop Schedules: Complexity and Approximation , 1978, Oper. Res..

[94]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[95]  Chee-Chuong Sum,et al.  An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment , 1997 .

[96]  Gerd Infanger Planning under uncertainty , 1992 .

[97]  John Leonard Burbidge,et al.  Group technology in the engineering industry : a report on research, financed by the Science Research Council, by Birmingham, Bradford and Salford Universities, and by the London School of Business Studies , 1979 .

[98]  Gabriel R. Bitran,et al.  ON THE DESIGN OF HIERARCHICAL PRODUCTION PLANNING SYSTEMS , 1977 .

[99]  Robert C. Leachman,et al.  An aggregate model of project-oriented production , 1989, IEEE Trans. Syst. Man Cybern..

[100]  George L. Nemhauser,et al.  Solving binary cutting stock problems by column generation and branch-and-bound , 1994, Comput. Optim. Appl..

[101]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[102]  U Dave,et al.  Critical Chain , 1998, J. Oper. Res. Soc..

[103]  Jonathan Rosenhead An Education in Robustness , 1978 .

[104]  Rasaratnam Logendran,et al.  Aggregate production planning — A survey of models and methodologies , 1992 .

[105]  J. Bertrand The Effect of Workload Dependent Due-Dates on Job Shop Performance , 1983 .

[106]  B. L. Dietrich A Taxonomy of Discrete Manufacturing Systems , 1991, Oper. Res..

[107]  Brian Shorrock,et al.  Material Requirements Planning , 1978 .

[108]  Juite Wang,et al.  A fuzzy robust scheduling approach for product development projects , 2004, Eur. J. Oper. Res..

[109]  Roel Leus,et al.  The generation of stable project plans , 2004, 4OR.

[110]  Noud Gademann,et al.  Please Scroll down for Article Iie Transactions Linear-programming-based Heuristics for Project Capacity Planning Linear-programming-based Heuristics for Project Capacity Planning , 2022 .

[111]  Willy Herroelen,et al.  A hierarchical approach to multi-project planning under uncertainty , 2004 .