Rescheduling with controllable processing times for number of disrupted jobs and manufacturing cost objectives

We consider a machine rescheduling problem that arises when a disruption such as machine breakdown occurs to a given schedule. Machine unavailability due to a breakdown requires repairing the schedule as the original schedule becomes infeasible. When repairing a disrupted schedule a desirable goal is to complete each disrupted job on time, i.e. not later than the planned completion time in the original schedule. We consider the case where processing times of jobs are controllable and compressing the processing time of a job requires extra processing cost. Usually, there exists a nonlinear relation between the processing time and manufacturing cost. We solve a bicriteria rescheduling problem that trades off the number of on-time jobs and manufacturing cost objectives. We give a mixed-integer second-order cone programming formulation for the problem. We develop a heuristic search algorithm to generate efficient solutions for the problem. Heuristic algorithm searches solution space by moving and swapping jobs among machines. We develop cost change estimates for job moves and swaps so that the heuristic implements only promising moves and hence generates a set of efficient solutions in reasonably short CPU times.

[1]  Rubén Ruiz,et al.  Flow shop rescheduling under different types of disruption , 2013 .

[2]  Gur Mosheiov,et al.  Batch scheduling of identical jobs with controllable processing times , 2014, Comput. Oper. Res..

[3]  Sinan Gürel,et al.  A strong conic quadratic reformulation for machine-job assignment with controllable processing times , 2009, Oper. Res. Lett..

[4]  Donald Goldfarb,et al.  Second-order cone programming , 2003, Math. Program..

[5]  Sinan Gürel,et al.  An anticipative scheduling approach with controllable processing times , 2010, Comput. Oper. Res..

[6]  Mostafa Zandieh,et al.  Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times , 2014, Comput. Oper. Res..

[7]  Jean-Charles Billaut,et al.  Multicriteria scheduling , 2005, Eur. J. Oper. Res..

[8]  Paolo Renna,et al.  Controllable processing time policies for job shop manufacturing system , 2013 .

[9]  J. M. Moore An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .

[10]  Arkadi Nemirovski,et al.  Lectures on modern convex optimization - analysis, algorithms, and engineering applications , 2001, MPS-SIAM series on optimization.

[11]  Jeffrey W. Herrmann,et al.  Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods , 2003, J. Sched..

[12]  Reha Uzsoy,et al.  Executing production schedules in the face of uncertainties: A review and some future directions , 2005, Eur. J. Oper. Res..

[13]  Dvir Shabtay,et al.  A survey of scheduling with controllable processing times , 2007, Discret. Appl. Math..

[14]  Robert H. Storer,et al.  Predictive/reactive scheduling with controllable processing times and earliness-tardiness penalties , 2009 .

[15]  Reha Uzsoy,et al.  Predictable scheduling of a job shop subject to breakdowns , 1998, IEEE Trans. Robotics Autom..

[16]  Bibo Yang,et al.  Single machine rescheduling with new jobs arrivals and processing time compression , 2007 .

[17]  Reha Uzsoy,et al.  Predictable scheduling of a single machine with breakdowns and sensitive jobs , 1999 .

[18]  Joseph Geunes,et al.  Predictive-reactive scheduling on a single resource with uncertain future jobs , 2008, Eur. J. Oper. Res..

[19]  Jaejin Jang,et al.  Production rescheduling for machine breakdown at a job shop , 2012 .

[20]  M. Azizoglu,et al.  Generating all efficient solutions of a rescheduling problem on unrelated parallel machines , 2009 .

[21]  Sinan Gürel,et al.  Parallel machine match-up scheduling with manufacturing cost considerations , 2010, J. Sched..