Method for solving multiobjective aggregate production planning problem with fuzzy parameters
暂无分享,去创建一个
M. Gen | K. Ida | Y. Tsujimura
[1] C. Hwang,et al. An aggregate production planning model and application of three multiple objective decision methods , 1980 .
[2] Simon French,et al. Multi-Objective Decision Analysis with Engineering and Business Applications , 1983 .
[3] Juan J. Gonzalez,et al. Master production scheduling: a multiple-objective linear programming approach , 1983 .
[4] Rafik A. Aliev,et al. Production control on the basis of fuzzy models , 1987 .
[5] H. Zimmermann. Fuzzy sets, decision making, and expert systems , 1987 .
[6] A. Ravindran,et al. Computational feasibility of multi-criteria models of production, planning and scheduling , 1988 .
[7] Madan M. Gupta,et al. Fuzzy mathematical models in engineering and management science , 1988 .
[8] R. S. Laundy,et al. Multiple Criteria Optimisation: Theory, Computation and Application , 1989 .
[9] E. Anderson. Note-A Note on the Dynamic Lot-Size Model with Uncertainty in Demand and Supply Processes , 1989 .