The myth of accelerating business processes through parallel job designs

This paper discusses postulated advantages of parallel job designs compared with sequential designs in business processes. Until now, the literature suggests an overall dominance of parallel designs. An analysis of relevant application domains, in which parallel tasks are prevalent in order to accelerate processes, offers two remarkable insights: (1) parallel tasks can but do not have to speed-up business processes; (2) coordination efforts may reduce or even invert potential performance gains. Thus, this paper thoroughly evaluates interdependencies between parallel designs and coordination efforts through simulation experiments. Several process patterns for order processing in a real-world example will be examined. The results offer noteworthy characteristics of parallel designs which extent the existing knowledge: (a) gains from parallelization are reduced with increasing process variability, (b) small increments in coordination efforts neutralize gains from parallelization, (c) in high work load situations, the resource capacity for the coordination task is a severe bottleneck, and (d) if the findings (a)–(c) are carefully considered, only the parallelization of multiple tasks leads to significant performance gains.

[1]  James D. Blocher,et al.  The customer order lead‐time problem on parallel machines , 1996 .

[2]  Fritz H. Grupe,et al.  Reengineering Through Simulation ModelingOptimizing a Telephone Ordering System at GPO , 1997, Inf. Syst. Manag..

[3]  Thomas H. Davenport,et al.  Process Innovation: Reengineering Work Through Information Technology , 1992 .

[4]  Guido Hächler Die parallele Koordinationssprache ALWAN , 1998, HMD Prax. Wirtsch..

[5]  Ralph H. Kilmann,et al.  The costs of organization structure: Dispelling the myths of independent divisions and organization-wide decision making , 1983 .

[6]  Bruno Achermann Aufbau eines Outbound Telesales Centers in 12 Wochen , 1998, HMD Prax. Wirtsch..

[7]  F. Liu,et al.  Product development performance measures in manufacturing firm , 2007, 2007 IEEE International Conference on Industrial Engineering and Engineering Management.

[8]  Thomas K. Roth-Roffy,et al.  Effects of Concurrent Engineering on Make-to-Order Products , 1995 .

[9]  John A. Buzacott,et al.  Abandoning the moving assembly line: models of human operators and job sequencing , 1990 .

[10]  Michael Zapf,et al.  Making Simulation Work for the Organizational Design of Communication Centers : Challenges and Practical Experience , 2001 .

[11]  Kripa Shanker,et al.  A loading and dispatching problem in a random flexible manufacturing system , 1985 .

[12]  Thomas W. Malone,et al.  Modeling the Performance of Organizational Structures , 1988, Oper. Res..

[13]  Jacob Rubinovitz,et al.  A weighted approach for assembly line design with station paralleling and equipment selection , 2003 .

[14]  Michael Zapf,et al.  Evaluation of Generic Process Design Patterns: An Experimental Study , 2000, Business Process Management.

[15]  Mark E. Nissen,et al.  Redesigning Reengineering Through Measurement-Driven Inference , 1998, MIS Q..

[16]  John A. Buzacott,et al.  Commonalities in Reengineered Business Processes: Models and Issues , 1996 .

[17]  A. Chakrabarti,et al.  Speeding Up the Pace of New Product Development , 1999 .

[18]  P. Will,et al.  Is concurrent engineering always a sensible proposition , 1995 .

[19]  Randall P. Sadowski,et al.  Simulation with Arena , 1998 .

[20]  Robert B. Handfield,et al.  Effects of concurrent engineering on make-to-order products , 1994 .

[21]  Henk Sol,et al.  Dynamic modelling for re-engineering organizations , 1996 .

[22]  H. Edwin Romeijn,et al.  Parallel machine scheduling: A probabilistic analysis , 1996 .

[23]  Kevin Crowston,et al.  The interdisciplinary study of coordination , 1994, CSUR.

[24]  Johnson Aimie Edosomwan Organizational transformation and process reengineering , 1996 .

[25]  M. Hammer,et al.  REENGINEERING THE CORPORATION: A MANIFESTO FOR BUSINESS REVOLUTION , 1995 .

[26]  G. Amdhal,et al.  Validity of the single processor approach to achieving large scale computing capabilities , 1967, AFIPS '67 (Spring).

[27]  P. Murmann Expected development time reductions in the German mechanical engineering industry , 1994 .

[28]  Roger V. Johnson,et al.  A Branch and Bound Algorithm for Assembly Line Balancing Problems with Formulation Irregularities , 1983 .

[29]  Michael J. Prietula,et al.  Computational organization theory: Autonomous agents and emergent behavior , 1994 .

[30]  Anitesh Barua,et al.  Reengineering information sharing behaviour in organizations , 1996, J. Inf. Technol..

[31]  Michael Zapf Prozeßgestaltung im Communication Center , 2001 .

[32]  Jürgen Quittek Prozessorzuteilung in Parallelrechnern mit Hilfe selbstorganisierender Karten , 1997 .

[33]  Basheer M. Khumawala,et al.  A branch and bound algorithm for assembly line balancing with paralleling , 1975 .

[34]  Kevin Crowston,et al.  A Coordination Theory Approach to Organizational Process Design , 1997 .

[35]  Torsten J. Gerpott,et al.  Simultaneous Engineering: Kritische Analyse eines Planungs- und Organisationsansatzes zur Erfolgsverbesserung industrieller Produktinnovationen , 2000 .

[36]  Arun Sundararajan,et al.  The effects of task and information asymmetry on business process redesign , 1997 .

[37]  H. Wildemann Simultaneous engineering als Baustein für Just-in-time in Forschung, Entwicklung und Konstruktion , 1992 .

[38]  Chwen Sheu,et al.  A managerial assessment of the waiting-time performance for alternative service process designs , 1996 .

[39]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[40]  Franz Liebl Simulation: Problemorientierte Einführung , 1995 .

[41]  F. Caeldries Reengineering the Corporation: A Manifesto for Business Revolution , 1994 .

[42]  Raimund Glücker Durchsatzsteigerung in einem Image-Processing-System durch Parallelverarbeitung , 1998, HMD Prax. Wirtsch..

[43]  A. Griffin Metrics for Measuring Product Development Cycle Time , 1993 .

[44]  Christian Siemers Parallele Programmierung - Nicht ohne Prozessor- und Rechnertechnik , 1998, HMD Prax. Wirtsch..

[45]  John W. Nazemetz,et al.  Evaluation of the performance domain of cellular and functional layouts , 1998 .

[46]  Paul S. Adler,et al.  From project to process management: an empirically-based framework for analyzing product development time , 1995 .

[47]  James D. Thompson Organizations in Action: Social Science Bases of Administrative Theory , 1967 .

[48]  Lars Trygg,et al.  Concurrent Engineering Practices in Selected Swedish Companies: A Movement or an Activity of the Few? , 1993 .

[49]  William G. Bulgren Discrete system simulation , 1982 .

[50]  Hans Zangl Durchlaufzeiten im Büro: Prozessorganisation u. Aufgabenintegration als effizienter Weg zur Rationalisierung d. Büroarbeit mit neuen Bürokommunikationstechniken , 1985 .

[51]  Thomas J. Housel,et al.  Reengineering Business Processes: A Complexity Theory Approach To Value Added , 1995 .

[52]  Michael Hammer,et al.  Reengineering Work: Don’t Automate, Obliterate , 1990 .

[53]  John M. Wilson,et al.  Business Processes: Modelling and Analysis for Re-engineering and Improvement , 1995 .

[54]  Sung-Ho Choi,et al.  A study on the measurement of comprehensive flexibility in manufacturing systems , 1998 .