Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems

This paper presents a method to find the optimal production, repair/replacement and preventive maintenance policies for a degraded manufacturing system. The system is subject to random machine failures and repairs. The status of the system is deemed to degrade with repair activities. When a failure occurs, the machine is either repaired or replaced, and a replacement action renews the machine, while a repair action brings it to a degraded operational state, with the next repair time increasing as the number of repairs increases as well. A preventive maintenance action is considered in order to improve the reliability of the machine, thereby reducing the amount of disruptions caused by machine failures. The decision variables are the production rate, the preventive maintenance rate and the repair/replacement switching policy upon machine failure. The objective of the study is to find the decision variables that minimize the overall cost, including repair, replacement, preventive maintenance, inventory holding and backlog costs over an infinite planning horizon. The proposed model is based on a semi-Markov decision process, and the stochastic dynamic programming method is used to obtain the optimality conditions. A numerical example is given to illustrate the proposed model, and a sensitivity analysis is considered in order to confirm the structure of the control policy and to illustrate the usefulness of the proposed approach.

[1]  Anis Gharbi,et al.  Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties , 2009, Eur. J. Oper. Res..

[2]  Ming Jian Zuo,et al.  Optimal replacement policy for a deteriorating production system with preventive maintenance , 2001, Int. J. Syst. Sci..

[3]  Kit-Nam Francis Leung A note on ‘A bivariate optimal replacement policy for a repairable system’ , 2006 .

[4]  Xiaolan Xie,et al.  Optimal joint preventive maintenance and production policies , 2005 .

[5]  Jean-Pierre Kenné,et al.  Optimal production, maintenance and lockout/tagout control policies in manufacturing systems , 2007 .

[6]  Zhe George Zhang,et al.  A discrete semi-Markov decision model to determine the optimal repair/replacement policy under general repairs , 2000, Eur. J. Oper. Res..

[7]  Dong-Ping Song,et al.  Production and preventive maintenance control in a stochastic manufacturing system , 2009 .

[8]  E. G. Kyriakidis,et al.  A semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times , 2008 .

[9]  Ali Gharbi,et al.  Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems , 2007 .

[10]  E. G. Kyriakidis,et al.  Markov decision models for the optimal maintenance of a production unit with an upstream buffer , 2009, Comput. Oper. Res..

[11]  Rafael Pérez-Ocón,et al.  A reliability semi-Markov model involving geometric processes , 2002 .

[12]  Rommert Dekker,et al.  Maintenance and Production: A Review of Planning Models , 2008 .

[13]  Viliam Makis,et al.  A note on optimal replacement policy under general repair , 1993 .

[14]  E. G. Kyriakidis,et al.  Optimal preventive maintenance of a production system with an intermediate buffer , 2006, Eur. J. Oper. Res..

[15]  Ali Gharbi,et al.  Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system , 2003 .

[16]  F. Beichelt A general maintenance model and its application to repair limit replacement policies , 1992 .

[17]  E. G. Kyriakidis,et al.  An improved algorithm for the computation of the optimal repair/replacement policy under general repairs , 2007, Eur. J. Oper. Res..

[18]  Nidhal Rezg,et al.  Preventive maintenance of manufacturing systems under environmental constraints , 2007 .

[19]  Thomas W. Sloan,et al.  Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information , 2008 .

[20]  Gwo-Liang Liao Optimal production correction and maintenance policy for imperfect process , 2007, Eur. J. Oper. Res..

[21]  Masaaki Kijima,et al.  Periodical replacement problem without assuming minimal repair , 1988 .

[22]  François Pérès,et al.  Evaluation of a maintenance strategy by the analysis of the rate of repair , 2003 .

[23]  María Dolores Berrade,et al.  Optimum Maintenance Policy of a Periodically Inspected System under Imperfect Repair , 2009, Adv. Oper. Res..

[24]  El-Kébir Boukas,et al.  Manufacturing flow control and preventing maintenance: a stochastic control approach , 1988 .

[25]  Y. Zhang A bivariate optimal replacement policy for a repairable system , 1994 .

[26]  Daoud Aït-Kadi,et al.  Performance evaluation of multi-state degraded systems with minimal repairs and imperfect preventive maintenance , 2010, Reliab. Eng. Syst. Saf..

[27]  Ali Gharbi,et al.  Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems , 2003 .

[28]  H. Kushner Numerical Methods for Stochastic Control Problems in Continuous Time , 2000 .

[29]  Qing Zhang,et al.  Hierarchical Decision Making in Stochastic Manufacturing Systems , 1994 .

[30]  Jean-Pierre Kenné,et al.  Hierarchical control of production and maintenance rates in manufacturing systems , 2003 .