First Results of the IFMIF/EVEDA-SaTHoRI Tests
暂无分享,去创建一个
Nicolas Bazin | Guillaume Devanz | Pol Carbonnier | Philippe Hardy | M. Desmons | Olivier Piquet | Y. Lussignol | Hassen Jenhani | Dominique Gex | Philippe Cara | Fabien Éozénou | Luc Maurice | Christophe Servouin | P. Mendez | Patrick Sahuquet | Antti Jokinen | Janic Chambrillon | G. Phillips | E. Jacques | Johan Relland | Jean Francois Denis | Iván Moya
[1] Nicolas Bazin,et al. Assembly Preparation of the IFMIF SRF Cryomodule , 2017 .
[2] Nicolas Bazin,et al. Progress in IFMIF Half Wave Resonators Manufacturing and Test Preparation , 2015 .
[3] Guillaume Devanz,et al. HIGH POWER PULSED TESTS OF A BETA=0.5 5-CELL 704 MHZ SUPERCONDUCTING CAVITY , 2011 .
[4] D. Regidor,et al. Technical and Logistical Challenges for IFMIF-LIPAC Cryomodule Construction , 2015 .
[5] Nicolas Bazin,et al. Manufacturing of the IFMIF Series Power Couplers , 2016 .
[6] D. Regidor,et al. LIPAc SRF Linac Couplers Conditioning , 2014 .
[7] Ivan Podadera,et al. Engineering Issues of the Medium Energy Beam Transport Line and SRF Linac for the LIPAc , 2016 .
[8] D. Regidor,et al. IFMIF-EVEDA RF POWER SYSTEM , 2011 .
[10] Nicolas Bazin,et al. Manufacturing and Validation Tests of IFMIF Low-Beta HWRs , 2017 .