Optimal preventive maintenance and replacement schedules with variable improvement factor

Purpose – This paper seeks to develop and present a new mathematical formulation to determine the optimal preventive maintenance and replacement schedule of a system.Design/methodology/approach – The paper divides the maintenance‐planning horizon into discrete and equally‐sized intervals and in each period decide on one of three possible actions: maintain the system, replace the system, or do nothing. Each decision carries a specific cost and affects the failure pattern of the system. The paper models the cases of minimizing total cost subject to a constraint on system reliability, and maximizing the system reliability subject to a budgetary constraint on total cost. The paper presents a new mathematical function to model an improvement factor based on the ratio of maintenance and repair costs, and show how it outperforms fixed improvement factor models by analyzing the effectiveness in terms of cost and reliability of the system.Findings – Optimal decisions in each period over a planning horizon are soug...

[1]  Sebastian Martorell,et al.  Age-dependent reliability model considering effects of maintenance and working conditions , 1999 .

[2]  Chun-Yuan Cheng,et al.  The Periodic Preventive Maintenance Policy for Deteriorating Systems by Using Improvement Factor Model , 2003 .

[3]  Dong Ho Park,et al.  Optimal Periodic Preventive Maintenance Schedules with Improvement Factors Depending on Number of Preventive Maintenances , 2007, Asia Pac. J. Oper. Res..

[4]  Bruce Christianson,et al.  Optimizing Preventive Maintenance Models , 2006, Comput. Optim. Appl..

[5]  Mazhar Ali Khan Malik,et al.  Reliable Preventive Maintenance Scheduling , 1979 .

[6]  T. Nakagawa Sequential imperfect preventive maintenance policies , 1988 .

[7]  D. N. Prabhakar Murthy,et al.  Optimal preventive maintenance of leased equipment with corrective minimal repairs , 2006, Eur. J. Oper. Res..

[8]  Y. Smeers,et al.  An age reduction approach for finite horizon optimization of preventive maintenance for single units subject to random failures , 1998 .

[9]  Ming J. Zuo,et al.  Sequential imperfect preventive maintenance models with two categories of failure modes , 2001 .

[10]  Che Hua Li Preventive Maintenance Scheduling via Particle Swarm Optimization Method , 2007, IMECS.

[11]  Harold E. Ascher,et al.  Repairable Systems Reliability: Modelling, Inference, Misconceptions and Their Causes , 1984 .

[12]  Harold E. Ascher Repairable Systems Reliability , 2008 .

[13]  John S. Usher,et al.  Cost optimal preventive maintenance and replacement scheduling , 1998 .

[14]  Sami El-Ferik,et al.  Age-based hybrid model for imperfect preventive maintenance , 2006 .

[15]  Xi Li-feng Research on sequential preventive maintenance policy in finite time horizon , 2005 .

[16]  C.Y. Cheng,et al.  The optimal periodic preventive maintenance policy with degradation rate reduction under reliability limit , 2007, 2007 IEEE International Conference on Industrial Engineering and Engineering Management.

[17]  V. Jayabalan,et al.  Cost optimization of maintenance scheduling for a system with assured reliability , 1992 .