Evaluation of Maintenance and EOL Operation Performance of Sensor-Embedded Laptops
暂无分享,去创建一个
[1] Surendra M. Gupta,et al. OPTIMAL MANAGEMENT OF REVERSE SUPPLY CHAINS WITH SENSOR-EMBEDDED END-OF-LIFE PRODUCTS , 2012 .
[2] Ashok Deshpande,et al. Maintenance of industrial equipment: Degree of certainty with fuzzy modelling using predictive maintenance , 2009 .
[3] H. M. Hashemian,et al. Wireless sensors for predictive maintenance of rotating equipment in research reactors , 2011 .
[4] Surendra M. Gupta,et al. Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line , 2010, Comput. Ind. Eng..
[5] Mitchell M. Tseng,et al. Managing component reuse in remanufacturing under product diffusion dynamics , 2017 .
[6] F. Sgarbossa,et al. A proactive model in sustainable food supply chain: Insight from a case study , 2017 .
[7] Ammar Y. Alqahtani,et al. Optimizing Two-Dimensional Renewable Warranty Policies for Sensor Embedded Remanufactured Products , 2017 .
[8] Hau L. Lee,et al. RFID and Operations Management: Technology, Value, and Incentives , 2007 .
[9] Seungjin Whang,et al. Radiofrequency Identification Applications in Private and Public Sector Operations: Introduction to the Special Issue , 2009 .
[10] Surendra M. Gupta,et al. Disassembling and Remanufacturing End-of-Life Sensor Embedded Cell Phones , 2015 .
[11] Surendra M. Gupta,et al. Buffer allocation plan for a remanufacturing cell , 2005, Comput. Ind. Eng..
[12] Eric W.T. Ngai,et al. RFID: Technology, applications, and impact on business operations , 2008 .
[13] Rebecca Angeles,et al. Rfid Technologies: Supply-Chain Applications and Implementation Issues , 2004, Inf. Syst. Manag..
[14] Surendra M. Gupta,et al. Quality management in product recovery using the Internet of Things: An optimization approach , 2014, Comput. Ind..
[15] Surendra M. Gupta,et al. A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system , 2014, Eur. J. Oper. Res..
[16] Vedat Verter,et al. Supply chain design for unlocking the value of remanufacturing under uncertainty , 2015, Eur. J. Oper. Res..
[17] Surendra M. Gupta,et al. Disassembly of multiple product structures , 1997 .
[18] Surendra M. Gupta,et al. Optimal End-of-Life Management in Closed-Loop Supply Chains Using RFID and Sensors , 2012, IEEE Transactions on Industrial Informatics.
[19] Surendra M. Gupta,et al. Recovery of sensor embedded washing machines using a multi-kanban controlled disassembly line , 2011 .
[20] Michel Gendreau,et al. Accelerating Benders decomposition for closed-loop supply chain network design: Case of used durable products with different quality levels , 2016, Eur. J. Oper. Res..
[21] Mehmet Ali Ilgin,et al. Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.
[22] Azad M. Madni,et al. Guest Editorial RFID Technology: Opportunities and Challenges , 2007, IEEE Syst. J..
[23] Shona D. Morgan,et al. A systematic literature review of remanufacturing scheduling , 2013 .
[24] Eric W.T. Ngai. RFID technology and applications in production and supply chain management , 2010 .
[25] Alexandre Dolgui,et al. Collection-disassembly problem in reverse supply chain , 2017 .
[26] James D. Abbey,et al. Remanufactured Products in Closed‐Loop Supply Chains for Consumer Goods , 2015 .
[27] Dong-Ho Lee,et al. Disassembly scheduling: literature review and future research directions , 2007 .
[28] Surendra M. Gupta,et al. An approach to quantify the financial benefit of embedding sensors into products for end-of-life management: a case study , 2014 .
[29] Dimitrios Makrakis,et al. Sensor-based information appliances , 2000 .
[30] Eric W. T. Ngai,et al. Managing RFID projects in organizations , 2009, Eur. J. Inf. Syst..
[31] Dong-Ho Lee,et al. A two-stage heuristic for disassembly scheduling with assembly product structure , 2004, J. Oper. Res. Soc..
[32] Kannan Govindan,et al. Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future , 2015, Eur. J. Oper. Res..
[33] Surendra M. Gupta,et al. Disassembly of complex product structures with parts and materials commonality , 1997 .
[34] Surendra M. Gupta,et al. Evaluating the impact of sensor-embedded products on the performance of an air conditioner disassembly line , 2011 .
[35] Surendra M. Gupta,et al. Performance improvement potential of sensor embedded products in environmental supply chains , 2011 .
[36] Tullio Tolio,et al. De-manufacturing Systems , 2014 .
[37] Kanchan Das,et al. Addressing environmental concerns in closed loop supply chain design and planning , 2015 .
[38] Ammar Y. Alqahtani,et al. One-Dimensional Renewable Warranty Management within Sustainable Supply Chain , 2017 .
[39] Surendra M. Gupta,et al. Lot sizing in reverse MRP for scheduling disassembly , 2008 .
[40] Surendra M. Gupta,et al. Coping with disassembly yield uncertainty in remanufacturing using sensor embedded products , 2011 .
[41] Surendra M. Gupta,et al. Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships , 2001, Eur. J. Oper. Res..
[42] Davide Giglio,et al. Integrated lot sizing and energy-efficient job shop scheduling problem in manufacturing/remanufacturing systems , 2017 .