Impact of model misspecification on the exponential EWMA charts: a robustness study when the time-between-events are not exponential
暂无分享,去创建一个
[1] F GanF,et al. 指数EWMA管理図のARL(平均連長)を計算する , 2000 .
[2] Connie M. Borror,et al. Robustness of the time between events CUSUM , 2003 .
[3] Thong Ngee Goh,et al. Cumulative quantity control charts for monitoring production processes , 2000 .
[4] Fah Fatt Gan,et al. Designs of One- and Two-Sided Exponential EWMA Charts , 1998 .
[5] D. A. Evans,et al. An approach to the probability distribution of cusum run length , 1972 .
[6] Stephen B. Vardeman,et al. Average Run Lengths for CUSUM Schemes When Observations Are Exponentially Distributed , 1985 .
[7] Connie M. Borror,et al. Robustness of the EWMA Control Chart to Non-Normality , 1999 .
[8] Fah Fatt Gan. Design of optimal exponential CUSUM control charts , 1994 .
[9] Thong Ngee Goh,et al. A control chart for the Gamma distribution as a model of time between events , 2007 .
[10] Charles W. Champ,et al. Phase I control charts for times between events , 2002 .
[11] Thong Ngee Goh,et al. A COMPARATIVE STUDY OF CCC AND CUSUM CHARTS , 1998 .