Status of J-PARC main ring synchrotron

Presented in this paper is a construction status of 50-GeV slow cycling main ring synchrotron (MR) of Japan Proton Accelerator Research Complex (J-PARC).

[1]  M. Tomizawa,et al.  New optics design of injection/fast extraction/abort lines of J-PARC main ring , 2007, 2007 IEEE Particle Accelerator Conference (PAC).

[2]  N. Tokuda,et al.  DESIGN OF SLOW EXTRACTION FROM 50-GeV PROTON SYNCHROTRON , 2002 .

[3]  高エネルギー加速器研究機構,et al.  Accelerator technical design report for J-PARC , 2003 .

[4]  K. Hasegawa Commissioning of the J-PARC linac , 2007, 2007 IEEE Particle Accelerator Conference (PAC).

[5]  M. Ikegami,et al.  COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX , 2006 .

[6]  M. Shirakata,et al.  Design of dynamic collimator for J-PARC main ring , 2007, 2007 IEEE Particle Accelerator Conference (PAC).

[7]  H. Matsumoto,et al.  Design study of a very large aperture eddy current septum for J-PARC , 2007, 2007 IEEE Particle Accelerator Conference (PAC).