Consolidation of the 13 kA Interconnects in the LHC for Operation at 7 TeV
暂无分享,去创建一个
P Fessia | Z Charifoulline | M Koratzinos | F Bertinelli | Herman H J ten Kate | C. Scheuerlein | M. Koratzinos | F. Bertinelli | P. Fessia | Z. Charifoulline | R. Denz | J. Steckert | A. Verweij | G. Willering | S. Sgobba | H. T. ten Kate | J. Tock | C. Garion | A. Perin | N. Lasheras | S Mathot | G P Willering | S. Mathot | C Scheuerlein | A P Verweij | C Garion | N Lasheras | R Denz | A Perin | S Sgobba | J Steckert | J.-P Tock
[1] P. Fessia. STATUS OF SPLICES IN 13 KA CIRCUITS , 2010 .
[2] A. P. Verweij,et al. MINIMUM REQUIREMENTS FOR THE 13 KA SPLICES FOR 7 TEV OPERATION , 2010 .
[3] Arjan Verweij,et al. HIGH-CURRENT BUS SPLICE RESISTANCES AND IMPLICATIONS FOR THE OPERATING ENERGY OF THE LHC , 2010 .
[4] H. Pfeffer,et al. Upgrade of the Quench Protection Systems for the Superconducting Circuits of the LHC Machine at CERN: From Concept and Design to the First Operational Experience , 2010 .
[5] P Fessia,et al. Thermal Runaways in LHC Interconnections: Experiments , 2011, IEEE Transactions on Applied Superconductivity.
[6] J. Strait,et al. Upgrade of the protection system for superconducting circuits in the LHC , 2009 .
[7] Parma,et al. Report of the Task Force on the Incident of 19th September 2008 at the LHC , 2009 .