Reliability optimization for series systems under uncertain component failure rates in the design phase

We develop an optimization model to determine the reliability design of critical components in a serial system. The system is under a service contract, and a penalty cost has to be paid by the OEM when the total system down time exceeds a predetermined level, which complicates the evaluation of the expected cost under a given reliability design. Furthermore, in the design phase for each critical component, all possible designs are subject to uncertain component failure rates. Considering the computational intractability of evaluating the system performance, we develop approximate evaluation methods which take the system uncertainty into account. Numerical results show that the method which includes randomness in the number of failures, failure rates and repair times leads to efficient and accurate evaluations and to close-to-optimal design decisions when used in an enumeration procedure for the optimization problem. We also show that ignoring these three types of uncertainty may result in bad design decisions.

[1]  Adamantios Mettas,et al.  Reliability allocation and optimization for complex systems , 2000, Annual Reliability and Maintainability Symposium. 2000 Proceedings. International Symposium on Product Quality and Integrity (Cat. No.00CH37055).

[2]  Serguei Netessine,et al.  Performance Contracting in After-Sales Service Supply Chains , 2007, Manag. Sci..

[3]  Edmundo de Souza e Silva,et al.  Calculating Cumulative Operational Time Distributions of Repairable Computer Systems , 1986, IEEE Transactions on Computers.

[4]  Yacov Y. Haimes,et al.  A decomposition method for optimization of large-system reliability , 1992 .

[5]  K. B. Misra,et al.  Reliability optimization through random search algorithm , 1974 .

[6]  P. Wang,et al.  Planning performance based contracts considering reliability and uncertain system usage , 2012, J. Oper. Res. Soc..

[7]  C.L. Hwang,et al.  Optimization of System Reliability by the Sequential Unconstrained Minimization Technique , 1975, IEEE Transactions on Reliability.

[8]  R.E. Brown,et al.  Failure rate modeling using equipment inspection data , 2004, IEEE Transactions on Power Systems.

[9]  Way Kuo,et al.  Recent Advances in Optimal Reliability Allocation , 2007, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.

[10]  M. C. van der Heijden,et al.  Interval uneffectiveness distribution for a k-out-of-n multistate reliability system with repair , 1988 .

[11]  Tongdan Jin,et al.  Variance of system-reliability estimates with arbitrarily repeated components , 2001, IEEE Trans. Reliab..

[12]  Kristian Möller,et al.  System supplier's customer strategy ☆ , 2007 .

[13]  Hongzhong Huang,et al.  Optimal reliability, warranty and price for new products , 2007 .

[14]  Sang-Hyun Kim,et al.  Reliability or Inventory? An Analysis of Performance-Based Contracts for Product Support Services , 2015 .

[15]  Serguei Netessine,et al.  Impact of Performance-Based Contracting on Product Reliability: An Empirical Analysis , 2011, Manag. Sci..

[16]  Mohammad Modarres,et al.  The Robust Deviation Redundancy Allocation Problem With Interval Component Reliabilities , 2012, IEEE Transactions on Reliability.

[17]  W. D. Ray,et al.  Stochastic Models: An Algorithmic Approach , 1995 .

[18]  L. Takács On certain sojourn time problems in the theory of stochastic processes , 1957 .

[19]  Dong Ho Park,et al.  Optimal warranty policies considering repair service and replacement service under the manufacturer’s perspective , 2016, Ann. Oper. Res..

[20]  Xabier Drèze,et al.  Su programa de lealtad lo está traicionando , 2006 .

[21]  Ahmad Al Hanbali,et al.  Interval availability analysis of a two-echelon, multi-item system , 2013, Eur. J. Oper. Res..

[22]  Toshio Nakagawa,et al.  A Note on Availability for a Finite Interval , 1973 .

[23]  Finn Wynstra,et al.  Performance-based contracting: a literature review and future research directions , 2015 .

[24]  Geert-Jan van Houtum,et al.  Optimization of component reliability in the design phase of capital goods , 2010, Eur. J. Oper. Res..

[25]  D. Coit System-reliability confidence-intervals for complex-systems with estimated component-reliability , 1997 .

[26]  van Gjjan Geert-Jan Houtum,et al.  Life cycle costs measurement of complex systems manufactured by an engineer-to-order company , 2007 .

[27]  D. N. P. Murthy,et al.  Warranty and redundancy design with uncertain quality , 1998 .

[28]  H. Paul Barringer,et al.  Life Cycle Cost Tutorial , 1996 .

[29]  R. E. Brown,et al.  Managing the risk of performance based rates , 2000 .

[30]  Baris Selçuk,et al.  Joint spare parts inventory and reliability decisions under a service constraint , 2013, J. Oper. Res. Soc..

[31]  Min Xie,et al.  A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting , 2015 .

[32]  Yu Tian,et al.  Optimizing reliability and service parts logistics for a time-varying installed base , 2012, Eur. J. Oper. Res..

[33]  D. N. P. Murthy,et al.  Warranty and optimal reliability improvement through product development , 2003 .

[34]  Amit Monga,et al.  Optimal system design considering maintenance and warranty , 1998, Comput. Oper. Res..

[35]  N. Agrawal,et al.  Winning in the aftermarket , 2006 .

[36]  Gregory Levitin,et al.  Algorithm for estimating reliability confidence bounds of multi-state systems , 2008, Reliab. Eng. Syst. Saf..

[37]  Alan Scheller-Wolf,et al.  Redundancy Optimization for Critical Components in High-Availability Technical Systems , 2013, Oper. Res..