Neural-network-based delivery time estimates for prioritized 300-mm automatic material handling operations

This paper deals with lot delivery estimates in a 300-mm automatic material handling system (AMHS), which is composed of several intrabay loops. We adopt a neural network approach to estimate the delivery times for both priority and regular lots. A network model is developed for each intrabay loop. Inputs to the proposed neural network model are the combination of transport requirements, automatic material handling resources, and ratios of priority lots against regular ones. A discrete-event simulation model based on the AMHS in a local 300-mm fab is built. Its outputs are adopted for training the neural network model with the back propagation method. The outputs of the neural network model are the expected delivery times of priority and regular lots in the loop, respectively. For a lot to be transported, its expected delivery time along a potential delivery path is estimated by the summation of all the loop delivery times along the path. A shortest path algorithm is used to find the path with the shortest delivery time among all the possible delivery paths. Numerical experiments based on realistic data from a 300-mm fab indicate that this neural network approach is sound and effective for the prediction of average delivery times. Both the delivery times for priority and regular lots get improved. Specially, for the cases of regular lots, our approach dynamically routes the lots according to the traffic conditions so that the potential blockings in busy loops can be avoided. This neural network approach is applicable to implementing a transport time estimator in dynamic lot dispatching and fab scheduling functions in realizing fully automated 300-mm manufacturing.

[1]  Jose C. Principe,et al.  Neural and adaptive systems , 2000 .

[2]  J. M. A. Tanchoco,et al.  Unidirectional circular layout for overhead material handling systems , 2000 .

[3]  T. Kojima,et al.  Low cost and short lead time AMHS design using interbay/intrabay diverging and converging IMP method for 300 mm fab , 2000, Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130).

[4]  Da-Yin Liao Dynamic OHT allocation and dispatching in large-scaled 300 mm AMHS management , 2002, Proceedings 2002 IEEE International Conference on Robotics and Automation (Cat. No.02CH37292).

[5]  D. Pillai,et al.  Integration of 300 mm fab layouts and material handling automation , 1999, 1999 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat No.99CH36314).

[6]  N. Bahri,et al.  A comparison of unified vs. segregated automated material handling systems for 300 mm fabs , 2001, 2001 IEEE International Symposium on Semiconductor Manufacturing. ISSM 2001. Conference Proceedings (Cat. No.01CH37203).

[7]  B. Subramaniam,et al.  Automation challenges in the next generation semiconductor factory , 1997, 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop ASMC 97 Proceedings.

[8]  J. Anderson,et al.  Travel time estimation in urban road networks , 1997, Proceedings of Conference on Intelligent Transportation Systems.

[9]  Chad D. DeJong,et al.  Simulating the transport and scheduling of priority lots in semiconductor factories , 2002, Proceedings of the Winter Simulation Conference.

[10]  S. Nash,et al.  Linear and Nonlinear Programming , 1987 .

[11]  Pius J. Egbelu,et al.  Characterization of automatic guided vehicle dispatching rules , 1984 .

[12]  P. M. Pelagagge,et al.  Simulation tool for design and management optimization of automated interbay material handling and storage systems for large wafer fab , 1995 .

[13]  Mikhail J. Atallah,et al.  Algorithms and Theory of Computation Handbook , 2009, Chapman & Hall/CRC Applied Algorithms and Data Structures series.

[14]  Yadati Narahari,et al.  Modeling the effect of hot lots in semiconductor manufacturing systems , 1997 .

[15]  R. G. Petrakian,et al.  Trade-offs in cycle time management: hot lots , 1992 .

[16]  L. R. Rilett,et al.  Dynamic O-D travel time estimation using an artificial neural network , 1995, Pacific Rim TransTech Conference. 1995 Vehicle Navigation and Information Systems Conference Proceedings. 6th International VNIS. A Ride into the Future.

[17]  Lefteri H. Tsoukalas,et al.  Fuzzy and neural approaches in engineering , 1997 .

[18]  D. Fronckowiak,et al.  Using discrete event simulation to analyze the impact of job priorities on cycle time in semiconductor manufacturing , 1996, IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings.