Neural-network-based delivery time estimates for prioritized 300-mm automatic material handling operations
暂无分享,去创建一个
[1] Jose C. Principe,et al. Neural and adaptive systems , 2000 .
[2] J. M. A. Tanchoco,et al. Unidirectional circular layout for overhead material handling systems , 2000 .
[3] T. Kojima,et al. Low cost and short lead time AMHS design using interbay/intrabay diverging and converging IMP method for 300 mm fab , 2000, Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130).
[4] Da-Yin Liao. Dynamic OHT allocation and dispatching in large-scaled 300 mm AMHS management , 2002, Proceedings 2002 IEEE International Conference on Robotics and Automation (Cat. No.02CH37292).
[5] D. Pillai,et al. Integration of 300 mm fab layouts and material handling automation , 1999, 1999 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat No.99CH36314).
[6] N. Bahri,et al. A comparison of unified vs. segregated automated material handling systems for 300 mm fabs , 2001, 2001 IEEE International Symposium on Semiconductor Manufacturing. ISSM 2001. Conference Proceedings (Cat. No.01CH37203).
[7] B. Subramaniam,et al. Automation challenges in the next generation semiconductor factory , 1997, 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop ASMC 97 Proceedings.
[8] J. Anderson,et al. Travel time estimation in urban road networks , 1997, Proceedings of Conference on Intelligent Transportation Systems.
[9] Chad D. DeJong,et al. Simulating the transport and scheduling of priority lots in semiconductor factories , 2002, Proceedings of the Winter Simulation Conference.
[10] S. Nash,et al. Linear and Nonlinear Programming , 1987 .
[11] Pius J. Egbelu,et al. Characterization of automatic guided vehicle dispatching rules , 1984 .
[12] P. M. Pelagagge,et al. Simulation tool for design and management optimization of automated interbay material handling and storage systems for large wafer fab , 1995 .
[13] Mikhail J. Atallah,et al. Algorithms and Theory of Computation Handbook , 2009, Chapman & Hall/CRC Applied Algorithms and Data Structures series.
[14] Yadati Narahari,et al. Modeling the effect of hot lots in semiconductor manufacturing systems , 1997 .
[15] R. G. Petrakian,et al. Trade-offs in cycle time management: hot lots , 1992 .
[16] L. R. Rilett,et al. Dynamic O-D travel time estimation using an artificial neural network , 1995, Pacific Rim TransTech Conference. 1995 Vehicle Navigation and Information Systems Conference Proceedings. 6th International VNIS. A Ride into the Future.
[17] Lefteri H. Tsoukalas,et al. Fuzzy and neural approaches in engineering , 1997 .
[18] D. Fronckowiak,et al. Using discrete event simulation to analyze the impact of job priorities on cycle time in semiconductor manufacturing , 1996, IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings.