Sustainability: the elusive element of process improvement

Purpose – This paper identifies ten “enablers” for sustaining process improvement (PI) activities.Design/methodology/approach – The enablers are derived from analysing 40 activities and identifying the significant enablers from the more successful activities.Findings – Five enablers associated with activities that fully realise the PI activity are identified and a further five enablers associated with those activities that go on to achieve continuous improvement are identified.Practical implications – The enablers are designed to assist people who conduct PI activities, cell leaders whose areas are involved in PI activities and change agents and change champions who are co‐ordinating PI programmes. The practical nature of the enablers means that they are based on processes that cell leaders, change agents and change champions can affect.Originality/value – PI activities are a crucial tool for companies undergoing a lean transformation and removing waste from their processes. PI activities have been conduc...

[1]  Harry Boer,et al.  Jump‐starting continuous improvement through self‐assessment , 2003 .

[2]  N. Bateman,et al.  Process improvement programmes: a model for assessing sustainability , 2002 .

[3]  J.D. Sterman,et al.  Nobody Ever Gets Credit for Fixing Problems That Never Happened: Creating and Sustaining Process Improvement , 2001, IEEE Engineering Management Review.

[4]  Michael Lewis,et al.  Lean production and sustainable competitive advantage , 2000 .

[5]  John Bicheno,et al.  The Lean Toolbox , 1999 .

[6]  Mike Kaye,et al.  Continuous improvement: the ten essential criteria , 1999 .

[7]  R. E. McQuater,et al.  Sustaining total quality management: what are the key issues? , 1997 .

[8]  David Upton,et al.  Mechanisms for Building and Sustaining Operations Improvement , 1996 .

[9]  H. Thomas Johnson,et al.  Relevance Regained: From Top-down Control to Bottom-up Empowerment , 1992 .

[10]  新郷 重夫,et al.  A study of the Toyota production system from an industrial engineering viewpoint , 1989 .

[11]  Taiichi Ohno,et al.  Toyota Production System : Beyond Large-Scale Production , 1988 .

[12]  Michael A. Cusumano,et al.  The Japanese Automobile Industry: Technology and Management at Nissan and Toyota by Michael A. Cusumano (review) , 1986 .

[13]  N. Bateman,et al.  The drive for process improvement , 2000 .

[14]  Daniel T. Jones,et al.  The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .