Resource Allocation Capabilities of Commercial Project Management Software Packages

This study concerns the quality of seven commercial project management software packages in allocating resources. Since the methods employed in these packages are proprietary, the quality is measured in terms of the deviation from an upper bound of the minimum makespan. As benchmark instances, a set of problems generated under a factorial design is used. Statistical tests are performed to investigate the impact of the problem parameters and to detect significant differences in quality among the packages.

[1]  Anita Pnrunak,et al.  The SPSS guide to data analysis , 1986 .

[2]  James H. Patterson,et al.  A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem , 1984 .

[3]  S. S. Panwalkar,et al.  A Survey of Scheduling Rules , 1977, Oper. Res..

[4]  Jack R. Meredith,et al.  Project Management: A Managerial Approach , 1989 .

[5]  Jan Karel Lenstra,et al.  Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..

[6]  Erik Demeulemeester,et al.  A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .

[7]  Rainer Kolisch,et al.  Characterization and generation of a general class of resource-constrained project scheduling problems , 1995 .

[8]  Richard F. Deckro,et al.  Resource constrained project crashing , 1989 .

[9]  Edward W. Davis,et al.  A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .

[10]  S. Addelman Orthogonal Main-Effect Plans for Asymmetrical Factorial Experiments , 1962 .

[11]  Pilar Tormos,et al.  Project Management: an Evaluation of Software Quality , 1994 .

[12]  Edward A. Wasil,et al.  Project Management on the PC: Software, Applications, and Trends , 1988 .

[13]  Ramón Alvarez-Valdés Olaguíbel,et al.  Chapter 5 – HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS , 1989 .

[14]  Gündüz Ulusoy,et al.  A survey on the resource-constrained project scheduling problem , 1995 .

[15]  Rainer Kolisch Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .

[16]  Rainer Kolisch,et al.  Efficient priority rules for the resource-constrained project scheduling problem , 1996 .

[17]  Willy Herroelen,et al.  An evaluation of microcomputer-based software packages for project management , 1990 .

[18]  Edward A. Wasil,et al.  Project management using a microcomputer , 1986, Comput. Oper. Res..

[19]  Robert J Willis,et al.  An iterative scheduling technique for resource-constrained project scheduling , 1992 .

[20]  Salah E. Elmaghraby,et al.  Activity networks: Project planning and control by network models , 1977 .

[21]  Rainer Kolisch,et al.  Auswahl von Standardsoftware, dargestellt am Beispiel von Programmen für das Projektmanagement , 1996, Wirtsch..