A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
暂无分享,去创建一个
[1] Christian Artigues,et al. Insertion techniques for static and dynamic resource-constrained project scheduling , 2003, Eur. J. Oper. Res..
[2] Armin Scholl,et al. PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem , 2000, Math. Methods Oper. Res..
[3] Ronald De Boer. Resource-constrained multi-project management, a hierarchical decision support system , 1998 .
[4] Richard F. Deckro,et al. Optimization analysis for design and planning of multi-project programs , 1998, Eur. J. Oper. Res..
[5] Mark Lycett,et al. Programme management: a critical review , 2004 .
[6] John H Payne,et al. Management of multiple simultaneous projects: a state-of-the-art review , 1995 .
[7] C. Vercellis. Constrained multi-project plannings problems: A Lagrangean decomposition approach , 1994 .
[8] Robert Klein,et al. Scheduling of Resource-Constrained Projects , 1999 .
[9] Dwight E. Smith-Daniels,et al. The Effects of Learning, Forgetting, and Relearning on Decision Rule Performance in Multiproject Scheduling , 1999 .
[10] John Dumond,et al. In a multi-resource environment, how much is enough? , 1992 .
[11] Thomas E. Morton,et al. Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics , 1993 .
[12] Armin Scholl,et al. Scattered branch and bound: an adaptive search strategy applied to resource-constrained project scheduling , 1998 .
[13] Rema Padman,et al. An integrated survey of deterministic project scheduling , 2001 .
[14] R. P. Mohanty,et al. Multiple projects-multiple resources-constrained scheduling: some studies , 1989 .
[15] María Pilar Tormos,et al. A multicriteria heuristic method to improve resource allocation in multiproject scheduling , 2000, Eur. J. Oper. Res..
[16] James Herbert Patterson,et al. Alternate Methods of Project Scheduling with Limited Resources , 1973 .
[17] Douglas B. Bock,et al. A Comparison of Due Date Setting, Resource Assignment, and Job Preemption Heuristics for the Multiproject Scheduling Problem* , 1990 .
[18] Rainer Kolisch,et al. Characterization and generation of a general class of resource-constrained project scheduling problems , 1995 .
[19] Grzegorz Waligóra,et al. Modelling Setup Times in Project Scheduling , 2006 .
[20] Willy Herroelen,et al. A hierarchical approach to multi-project planning under uncertainty , 2004 .
[21] Mario Vanhoucke. Setup times and fast tracking in resource-constrained project scheduling , 2008, Comput. Ind. Eng..
[22] N. Trautmann. Anlagenbelegungsplanung in der Prozeßindustrie , 2001 .
[23] Michael Tobis,et al. Managing Multiple Projects , 2002 .
[24] James H. Patterson,et al. A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem , 1984 .
[25] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[26] Rainer Kolisch. Resource-Constrained Project Scheduling with Setup-Times , 1993 .
[27] Kum Khiong Yang,et al. A comparison of resource allocation and activity scheduling rules in a dynamic multi-project environment , 1993 .
[28] Subhash C. Narula,et al. Multi-Project Scheduling: Analysis of Project Performance , 1985 .
[29] R. Kolisch,et al. Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis , 1999 .
[30] A. A. Elimam,et al. Audit scheduling with overlapping activities and sequence-dependent setup costs , 1996 .
[31] John Dumond,et al. An Examination of Resourcing Policies for the Multi‐resource Problem , 1993 .
[32] Boaz Golany,et al. Managing multi-project environments through constant work-in-process , 2003 .
[33] Neng-Hui Shih,et al. ON THE PROJECT SCHEDULING UNDER RESOURCE CONSTRAINTS , 2006 .
[34] I. Kurtulus,et al. Multi-Project Scheduling: Categorization of Heuristic Rules Performance , 1982 .
[35] Rainer Kolisch,et al. Project Scheduling under Resource Constraints , 1995 .
[36] Mario Vanhoucke,et al. Pre-emptive resource-constrained project scheduling with setup times , 2006 .
[37] Chee-Chuong Sum,et al. An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment , 1997 .
[38] María Pilar Tormos,et al. Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling , 2001, Ann. Oper. Res..
[39] Armin Scholl,et al. Managing and modelling general resource transfers in (multi-)project scheduling , 2010, OR Spectr..
[40] Erik Demeulemeester,et al. Project scheduling : a research handbook , 2002 .
[41] Joanna Józefowska,et al. Perspectives in modern project scheduling , 2006 .
[42] Rainer Kolisch,et al. Experimental investigation of heuristics for resource-constrained project scheduling: An update , 2006, Eur. J. Oper. Res..
[43] Professor Dr. Klaus Neumann,et al. Project Scheduling with Time Windows and Scarce Resources , 2003, Springer Berlin Heidelberg.
[44] A. Alan B. Pritsker,et al. Multiproject Scheduling with Limited Resources , 1968 .
[45] Jan Węglarz,et al. Project scheduling : recent models, algorithms, and applications , 1999 .
[46] Vincent A. Mabert,et al. Evaluating project scheduling and due date assignment procedures: an experimental analysis , 1988 .