Simulating Uncertainties in Construction Projects with Chronographical Scheduling Logic
暂无分享,去创建一个
[1] Steven D. Eppinger,et al. A Model-Based Framework to Overlap Product Development Activities , 1997 .
[2] Edmond T. Miresco,et al. A chronographic method for construction project planning , 2006 .
[3] Michael R. Duffey,et al. Statistical dependence in risk analysis for project networks using Monte Carlo methods , 1999 .
[4] Low Sui Pheng,et al. Environmental factors and work performance of project managers in the construction industry , 2006 .
[5] Julio C. Martinez,et al. State-Based Probabilistic Scheduling Using STROBOSCOPE's CPM Add-On , 1997 .
[6] Steven D. Eppinger,et al. Generalised models of design interation using signal flow graphs , 1997 .
[7] Steven D. Eppinger,et al. Generalized models of design iteration using signal flow graphs , 1995 .
[8] K. MacCrimmon,et al. An Analytical Study of the PERT Assumptions , 1964 .
[9] D. Gong,et al. Time-uncertainty analysis in project networks with a new merge-event time-estimation technique , 1993 .
[10] Jesus M. de la Garza,et al. Critical Path Method with Multiple Calendars , 2005 .
[11] Reza H. Ahmadi,et al. Concurrent Crashing and Overlapping in Product Development , 2004, Oper. Res..
[12] Miklós Hajdu. Network Scheduling Techniques for Construction Project Management , 1996 .
[13] Feniosky Peña-Mora,et al. Modeling and representation of non-value adding activities due to errors and changes in design and construction projects , 2007, 2007 Winter Simulation Conference.
[14] Edmond T. Miresco,et al. Simulation of scheduling logic using dynamic functions , 2013 .
[15] J. D. Wiest,et al. Precedence diagramming method: Some unusual characteristics and their implications for project managers , 1981 .
[16] Edmond T. Miresco,et al. Decision Support for Project Management using A Chronographic Approach , 2002, J. Decis. Syst..
[17] Feniosky Peña-Mora,et al. Dynamic Planning for Fast-Tracking Building Construction Projects , 2001 .
[18] Frank E. Grubbs. Letter to the Editor---Attempts to Validate Certain PERT Statistics or “Picking on PERT” , 1962 .
[19] Feniosky Peña-Mora,et al. DYNAMIC PLANNING AND CONTROL METHODOLOGY FOR DESIGN/BUILD FAST-TRACK CONSTRUCTION PROJECTS , 2001 .
[20] D. Malcolm,et al. Application of a Technique for Research and Development Program Evaluation , 1959 .
[21] Simaan M. AbouRizk,et al. Simplified CPM/PERT Simulation Model , 2000 .