Fuzzy Multicriteria Decision-Making Approach for Pavement Project Evaluation Using Life-Cycle Cost/Performance Analysis

Project life-cycle cost analysis (LCCA) is a reasonable approach to compare pavement design alternatives, but not taking into consideration of pavement performance in the most LCCA approaches may lead not to obtain the most desirable alternative for road users and associated highway agencies. This article introduces a multicriteria decision making method for pavement project evaluation using LCCA that (1) utilizes fuzzy set theory to model and handle uncertainties; (2) takes into account the extra user costs attributable to inadequate pavement condition; and (3) as a criterion, considers life-cycle pavement performance that describes overall pavement serviceability condition. Using a hypothetical project, the paper clarifies the performance of the proposed method for long-term evaluating alternative pavement design strategies. The alternatives are compared with respect to each criterion of the method, and also using sensitivity analysis, it is determined that changes in the decision maker’s risk and confidence attitudes can affect the ranking of the alternatives.

[1]  Samuel Labi,et al.  Decision support for optimal scheduling of highway pavement preventive maintenance within resurfacing cycle , 2008, Decis. Support Syst..

[2]  Khaled A. Abaza Optimum Flexible Pavement Life-Cycle Analysis Model , 2002 .

[3]  Tien Fang Fwa,et al.  PAVEMENT PERFORMANCE AND LIFE-CYCLE COST ANALYSIS , 1991 .

[4]  Samuel Labi,et al.  Life Cycle Cost Analysis for INDOT Pavement Design Procedures , 2005 .

[5]  Samuel Labi,et al.  Life-Cycle Evaluation of Flexible Pavement Preventive Maintenance , 2005 .

[6]  Maxwell G. Lay,et al.  Handbook of road technology , 1986 .

[7]  Gregory A. Keoleian,et al.  Evaluation of Life-Cycle Cost Analysis Practices Used by the Michigan Department of Transportation , 2008 .

[8]  Susan L. Tighe,et al.  Guidelines for Probabilistic Pavement Life Cycle Cost Analysis , 2001 .

[9]  John P Zaniewski,et al.  Risk-Based Life-Cycle Cost Analysis for Project-Level Pavement Management , 2002 .

[10]  Madan M. Gupta,et al.  Approximate reasoning in decision analysis , 1982 .

[11]  M. R. Smith,et al.  Life Cycle Cost Analysis in Pavement Design: In Search of Better Investment Decisions , 1998 .

[12]  Wei Wang,et al.  Risk and confidence analysis for fuzzy multicriteria decision making , 2006, Knowl. Based Syst..

[13]  Zongzhi Li,et al.  Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study , 2009 .

[14]  Aminah Robinson Fayek,et al.  Fuzzy Numbers in Cost Range Estimating , 2007 .