A Bayesian Model of Cycle Time Prediction
暂无分享,去创建一个
Christina Y.J. Chen | Edward I. George | Valerie Tardif | E. George | Christina Y.J. Chen | Valerie Tardif
[1] M. Spearman. An Analytic Congestion Model for Closed Production Systems with IFR Processing Times , 1991 .
[2] Stephen S. Lavenberg,et al. Mean-Value Analysis of Closed Multichain Queuing Networks , 1980, JACM.
[3] C. Roger Glassey,et al. Bottleneck Starvation Indicators for Shop Floor Control , 1988 .
[4] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[5] Valéria Menyhértová. On adaptive replacement policies , 1980, Kybernetika.
[6] Mauricio G. C. Resende,et al. Closed-loop job release control for VLSI circuit manufacturing , 1988 .
[7] H. F. Martz,et al. The risk of catastrophic failure of the solid rocket boosters on the space shuttle , 1992 .
[8] Bhaba R. Sarker,et al. A Review of:“Factory Physics: Foundations of Manufacturing Management” Wallace J. Hopp and Mark L. Spearman Richard D. Irwin, Inc., 1996 , 1997 .
[9] Judith E. Dayhoff,et al. Signature analysis of dispatch schemes in wafer fabrication , 1986 .
[10] G. Casella,et al. Explaining the Gibbs Sampler , 1992 .
[11] Elmira Popova,et al. Adaptive Replacement Policies for a System of Parallel Machines , 1996 .
[12] J. Little. A Proof for the Queuing Formula: L = λW , 1961 .
[13] Mauricio G. C. Resende,et al. A scheduling rule for job release in semiconductor fabrication , 1988 .
[14] C. R. Glassey,et al. Bottleneck starvation indicators for shop floor control (semiconductor manufacturing process) , 1988 .
[15] W. Whitt,et al. Open and closed models for networks of queues , 1984, AT&T Bell Laboratories Technical Journal.
[16] W. J. Gordon,et al. Closed Queuing Systems with Exponential Servers , 1967, Oper. Res..
[17] S. Chib,et al. Understanding the Metropolis-Hastings Algorithm , 1995 .
[18] A. Gelfand,et al. Hierarchical Bayes Models for the Progression of HIV Infection Using Longitudinal CD4 T-Cell Numbers , 1992 .
[19] R. Atherton,et al. Signature Analysis: Simulation of Inventory, Cycle Time, and Throughput Trade-Offs in Wafer Fabrication , 1986 .
[20] M. Newton. Approximate Bayesian-inference With the Weighted Likelihood Bootstrap , 1994 .
[21] W. Whitt,et al. The Queueing Network Analyzer , 1983, The Bell System Technical Journal.
[22] C. R. Glassey,et al. The use of bottleneck starvation avoidance with queue predictions in shop floor control , 1989, WSC '89.
[23] Pravin K. Johri,et al. Practical issues in scheduling and dispatching in semiconductor wafer fabrication , 1993 .