Suitable layout of gate roads related to slice mining in an ultra-thick unstable coal seam
暂无分享,去创建一个
[1] Zhao Hai-xia. Research on translation layout of mining gateway in seam coal with closed distance to other seam , 2008 .
[2] Xiao Wei-guo,et al. Application of Analytic Method in Calculating Floor Stress of a Working Face , 2007 .
[3] Syd S. Peng,et al. Coal Mine Ground Control , 1978 .
[4] Daigoro Hayashi,et al. Finite element modeling of stress distributions and problems for multi-slice longwall mining in Bangladesh, with special reference to the Barapukuria coal mine , 2009 .
[5] Li Bao-fu,et al. The Theory and Practice of Outward Staggered Entries Arranging in Stoping , 2006 .
[6] Li Hong,et al. Close range sub-coal seam roadway arrangement and its support ways , 2006 .
[7] Zhai Ying-da,et al. DISCUSSION ON METHOD FOR DETERMINING REASONABLE POSITION OF ROADWAY FOR ULTRA-CLOSE MULTI-SEAM , 2008 .
[8] Li Liang-hong. Support Mechanism of Side Bolts in Lower Slicing Roadway , 2007 .