Managing the job shop: simulating the effects of flexibility, order release mechanisms and sequencing rules
暂无分享,去创建一个
[1] D. R. Denzler,et al. Periodic reconfiguration of general-purpose fixtures in a dedicated FMS , 1993 .
[2] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[3] Kenneth R. Baker,et al. The effects of input control in a simple scheduling model , 1984 .
[4] D. R. Denzler,et al. Evaluating variance control, order review/release and dispatching: a regression analysis , 1994 .
[5] Steven A. Melnyk,et al. Order review/release: research issues and perspectives , 1989 .
[6] Wolfgang Bechte. Theory and practice of load-oriented manufacturing control , 1988 .
[7] J. L. Bower,et al. Fast-Cycle Capability for Competitive Power , 1988 .
[8] D. R. Denzler,et al. EXAMINING THE USE OF DEDICATED AND GENERAL PURPOSE PALLETS IN A DEDICATED FLEXIBLE MANUFACTURING SYSTEM , 1991 .
[9] D. Gerwin. Manufacturing flexibility: a strategic perspective , 1993 .
[10] Ranga V. Ramasesh,et al. Measurement of manufacturing flexibility: A value based approach , 1991 .
[11] P. M. Bobrowski,et al. Work release strategies in a dual resource constrained job shop , 1989 .
[12] John J. Kanet,et al. Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times , 1989 .
[13] Michael Lissack,et al. Complexity: the Science, its Vocabulary, and its Relation to Organizations , 1999 .
[14] Paul M. Swamidass,et al. Manufacturing strategy, environmental uncertainty and performance: a path analytic model , 1987 .
[15] John B. Jensen,et al. An Evaluation of Capacity Sensitive Order Review and Release Procedures in Job Shops , 1993 .
[16] Mariann Jelinek,et al. Computer Integrated Flexible Manufacturing: Organizational, Economic, and Strategic Implications , 1985 .
[17] Christopher A. Voss,et al. Managing Advanced Manufacturing Technology , 1986 .
[18] Mary Jo Maffei,et al. Dealing with the Uncertainties of Manufacturing: Flexibility, Buffers and Integration , 1993 .
[19] Amrik S. Sohal,et al. Trends in Materials Management , 1987 .
[20] Vincent A. Mabert,et al. AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .
[21] Warren W. Fisher,et al. Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling* , 1992 .
[22] Terry Hill,et al. Flexibility – A Manufacturing Conundrum , 1991 .
[23] John J. Kanet,et al. Open Order Rescheduling in Job Shops with Demand Uncertainty: A Simulation Study , 1988 .