Single-machine slack due-window assignment scheduling with multiple maintenance activities and position-and-resource-dependent processing times

This paper studies the slack due-window assignment method for single-machine scheduling problems with position-and resource-dependent processing times, for which the actual processing time is a con...

[1]  Ji-Bo Wang,et al.  Single-Machine Due-Window Assignment and Scheduling with Learning Effect and Resource-Dependent Processing Times , 2014, Asia Pac. J. Oper. Res..

[2]  T.C.E. Cheng,et al.  Multitasking parallel-machine scheduling with machine-dependent slack due-window assignment , 2018, Int. J. Prod. Res..

[3]  Dehua Xu,et al.  Some scheduling problems with general position-dependent and time-dependent learning effects , 2009, Inf. Sci..

[4]  T.C.E. Cheng,et al.  A bicriterion approach to common flow allowances due window assignment and scheduling with controllable processing times , 2017 .

[5]  Baruch Mor,et al.  Minmax scheduling problems with common due-date and completion time penalty , 2018, J. Comb. Optim..

[6]  Adam Janiak,et al.  A survey on scheduling problems with due windows , 2015, Eur. J. Oper. Res..

[7]  Yongjian Yang,et al.  Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents , 2018, Naval Research Logistics.

[8]  T.C.E. Cheng,et al.  Due-date assignment and single-machine scheduling with generalised position-dependent deteriorating jobs and deteriorating multi-maintenance activities , 2014 .

[9]  Weiwei Liu,et al.  Single-machine resource allocation scheduling with due-date assignment, deterioration effect and position-dependent weights , 2020, Engineering Optimization.

[10]  Alessandro Agnetis,et al.  Scheduling Problems with Two Competing Agents , 2004, Oper. Res..

[11]  Stanisław Gawiejnowicz,et al.  Models and Algorithms of Time-Dependent Scheduling , 2020, Monographs in Theoretical Computer Science. An EATCS Series.

[12]  Vitaly A. Strusevich,et al.  Combining time and position dependent effects on a single machine subject to rate-modifying activities , 2014 .

[13]  Chin-Chia Wu,et al.  Resource constrained scheduling problems with general truncated sum-of-processing time dependent effect under single machine and unrelated parallel machines , 2017, Comput. Ind. Eng..

[14]  Marcelo Seido Nagano,et al.  Structural properties and algorithms for earliness and tardiness scheduling against common due dates and windows: A review , 2020, Comput. Ind. Eng..

[15]  Dan Wang,et al.  Single-machine scheduling with learning effect and resource-dependent processing times , 2010, Comput. Ind. Eng..

[16]  Gang Li,et al.  Single-machine due-window assignment scheduling based on common flow allowance, learning effect and resource allocation , 2015 .

[17]  Yunqiang Yin,et al.  Two‐agent scheduling with linear resource‐dependent processing times , 2020, Naval Research Logistics (NRL).

[18]  Chengbin Chu,et al.  Due date assignment and scheduling: Slk, TWK and other due date assignment models , 2002 .

[19]  Tao Liu,et al.  Due-window assignment scheduling in the proportionate flow shop setting , 2020, Ann. Oper. Res..

[20]  Guohua Wan,et al.  Single machine SLK/DIF due window assignment problem with job-dependent linear deterioration effects , 2016, J. Oper. Res. Soc..