A Fuzzy Simulated Annealing approach for project time-cost tradeoff
暂无分享,去创建一个
[1] S. Thomas Ng,et al. Optimizing Construction Time and Cost Using Ant Colony Optimization Approach , 2008 .
[2] Erik Demeulemeester,et al. Optimal procedures for the discrete time/cost trade-off problem in project networks , 1996 .
[3] Zülal Güngör,et al. An application of fuzzy goal programming to a multiobjective project network problem , 2001, Fuzzy Sets Syst..
[4] Erik Demeulemeester,et al. Discrete time/cost trade-offs in project scheduling with time-switch constraints , 2002, J. Oper. Res. Soc..
[5] M. Dessouky,et al. Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept , 1977 .
[6] R. Tibshirani,et al. An introduction to the bootstrap , 1993 .
[7] Hamed R. Tareghian,et al. A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search , 2007, Appl. Math. Comput..
[8] Emile H. L. Aarts,et al. Simulated Annealing: Theory and Applications , 1987, Mathematics and Its Applications.
[9] Abbas Afshar,et al. Fuzzy-based MOGA approach to stochastic time-cost trade-off problem , 2009 .
[10] Shih-Pin Chen,et al. Time-cost trade-off analysis of project networks in fuzzy environments , 2011, Eur. J. Oper. Res..
[11] Richard Bellman,et al. Decision-making in fuzzy environment , 2012 .
[12] Mohan M. Kumaraswamy,et al. Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization , 2004 .
[13] C. R. Bector,et al. Fuzzy Mathematical Programming and Fuzzy Matrix Games , 2005 .
[14] I-Tung Yang,et al. Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis , 2007 .
[15] Christine Strauss,et al. A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management , 2000, INFORMS J. Comput..
[16] Rita Almeida Ribeiro,et al. Solving Fuzzy Optimization Problems: Flexible Approaches using Simulated Annealing , 1996 .
[17] Lin Yan,et al. Research on the fully fuzzy time-cost trade-off based on genetic algorithms , 2005 .
[18] Reza Abbasnia,et al. Time-Cost Trade-off Problem in Construction Project Management, Based on Fuzzy Logic , 2008 .
[19] Rita Almeida Ribeiro,et al. Fuzzy linear programming via simulated annealing , 1999, Kybernetika.
[20] I-Tung Yang,et al. Performing complex project crashing analysis with aid of particle swarm optimization algorithm , 2007 .
[21] Cengiz Haksever,et al. Flexible Model for Time'Cost Tradeoff Problem , 2004 .
[22] Sou-Sen Leu,et al. A GA-based fuzzy optimal model for construction time-cost trade-off , 2001 .
[23] Chung-Wei Feng,et al. Stochastic construction time-cost trade-off analysis , 2000 .
[24] Xin Gao,et al. New fuzzy models for time-cost trade-off problem , 2010, Fuzzy Optim. Decis. Mak..
[25] Rita Almeida Ribeiro,et al. Fuzzy Optimization using Simulated Annealing:An Example Set , 2003 .
[26] Milton D. Rosenau,et al. Successful Project Management: A Step-by-Step Approach with Practical Examples , 1981 .
[27] Bernard W. Taylor,et al. Introduction to Management Science , 2006 .
[28] S. Gottwald,et al. Fuzzy set theory and its applications. Second edition , 1992 .
[29] Michael E. Kuhl,et al. A dynamic crashing method for project management using simulation-based optimization , 2008, 2008 Winter Simulation Conference.
[30] W. Verdini,et al. Nonlinear time/cost tradeoff models in project management , 1995 .