A bid‐unbalancing method for lowering a contractor's financial risk

A method is presented for unbalancing bids and optimizing the allocation of overall project profits to individual activities by considering the financial parameters of a project (bid mark‐up and projected cash flow), in conjunction with lowering the exposure to possible financial disorder in the project. The method utilizes the general concept of entropy and a variant of it (hereby termed ‘monetary entropy’, H M) as measures of a project's perceived level of disorder, in order to distribute the total bid mark‐up to the project activities. The entropy‐based bid‐unbalancing method seeks to minimize a possible financial disorder (the monetary entropy) resulting from limited monetary resources available to the project and from badly developed project cash flows. The intended primary users of the method are contractors during the initial bidding stage of a project.

[1]  Jeffrey S. Russell,et al.  Long-Term Entropy and Profitability Change of United States Public Construction Firms , 2005 .

[2]  M. Gates Bidding Strategies and Probabilities , 1967 .

[3]  Peter Brucker,et al.  Lower bounds for resource-constrained project scheduling problems , 2003, Eur. J. Oper. Res..

[4]  Anurag Agarwal,et al.  Resource Constrained Project Scheduling: a Hybrid Neural Approach , 2006 .

[5]  Ahmed Senouci,et al.  Use of Genetic Algorithms in Resource Scheduling of Construction Projects , 2004 .

[6]  JRmes M. Crawford An Approach to Resource Constrained Project Scheduling , 1996 .

[7]  P. G. Ioannou Bidding Models — Symmetry and State of Information , 1988 .

[8]  Peter Brucker,et al.  A branch and bound algorithm for the resource-constrained project scheduling problem , 1998, Eur. J. Oper. Res..

[9]  Alf Kimms,et al.  Resource-Constrained Scheduling , 2001 .

[10]  Pooyan Aslani Dynamic resource -constrained scheduling , 2007 .

[11]  Robert M. Stark UNBALANCED BIDDING MODELS - THEORY , 1968 .

[12]  Manuel López-Ibáñez,et al.  Ant colony optimization , 2010, GECCO '10.

[13]  James H. Patterson,et al.  A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem , 1984 .

[14]  Erik Demeulemeester,et al.  A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .

[15]  Paul Teicholz,et al.  Pre-Estimate Cash Flow Analysis , 1977 .

[16]  Shu-Quan Li,et al.  Optimization of resource allocation in construction using genetic algorithms , 2005, 2005 International Conference on Machine Learning and Cybernetics.

[17]  L. Friedman A Competitive-Bidding Strategy , 1956 .

[18]  Athanasios P. Chassiakos,et al.  Project time-cost analysis under generalised precedence relations , 2002 .

[19]  Symeon E. Christodoulou ANT COLONY OPTIMIZATION IN CONSTRUCTION SCHEDULING , 2005 .

[20]  Erik Demeulemeester,et al.  New Benchmark Results for the Resource-Constrained Project Scheduling Problem , 1997 .

[21]  Tong Yizhe,et al.  Unbalanced bidding on contracts with variation trends in client-provided quantities , 1992 .

[22]  V. Maniezzo,et al.  An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation , 1998 .

[23]  Tarek Hegazy,et al.  Optimization of Resource Allocation and Leveling Using Genetic Algorithms , 1999 .

[24]  A. Kaka,et al.  Review of Unbalanced Bidding Models in Construction , 2007 .

[25]  Albert Battersby,et al.  Advances in Critical Path Methods , 1966 .