Project Adapted Scheduling Algorithm for the On-Demand Bus System

The problem of the developed Innovative On-demand Bus service with cloud computing technology is not to be able to react to the complicated request from local government. This is because the same calculation algorithm is introduced in all projects. In order to answer the complicated requirement to the On-demand Bus scheduling algorithm from each project, the project adapted scheduling algorithm is developed and evaluated by the computer simulation experiment. According to the result of computer simulation, the proposed scheduling algorithm performed as designed and it is proved that the developed scheduling algorithm can calculate the schedule of the On-demand Bus in answering the complicated requirement of project by coordinating the parameter.