Scheduling job shops with delays
暂无分享,去创建一个
[1] Stanley B. Gershwin,et al. Performance of hierarchical production scheduling policy , 1984 .
[2] Stanley B. Gershwin,et al. Short term production scheduling of an automated manufacturing facility , 1984, The 23rd IEEE Conference on Decision and Control.
[3] Van Ryzin,et al. Control of manufacturing systems with delay , 1987 .
[4] Iu M Repin,et al. On the approximate replacement of systems with lag by ordinary dynamical systems , 1965 .
[5] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .
[6] Stephen C. Graves,et al. Scheduling of re-entrant flow shops , 1983 .