AN EVALUATION OF LANE CLOSURE STRATEGIES FOR INTERSTATE WORK ZONES. FINAL REPORT
暂无分享,去创建一个
[1] Steven Z Levine,et al. PLANNING AND OPERATION OF URBAN HIGHWAY WORK ZONES , 1984 .
[2] Mitsuru Saito. The development of a statewide network level bridge management system , 1988 .
[3] Nagui M. Rouphail,et al. TRAFFIC CONTROL AT FREEWAY WORK SITES , 1983 .
[4] V. Barnett,et al. Applied Linear Statistical Models , 1975 .
[5] Conrad L Dudek,et al. QUEUE AND USER COST EVALUATION OF WORK ZONES (QUEWZ) , 1984 .
[6] Stephen H Richards,et al. FIELD EVALUATION OF HIGHWAY ADVISORY RADIO FOR TRAFFIC MANAGEMENT IN WORK ZONES (ABRIDGMENT) , 1981 .
[7] Stephen H Richards,et al. FIELD EVALUATION OF WORK ZONE SPEED CONTROL TECHNIQUES , 1985 .
[8] O J Pendleton,et al. Application of new accident analysis methodologies; volume 3: theoretical development , 1991 .
[9] Kenneth R. Agent,et al. HIGHWAY ACCIDENTS IN CONSTRUCTION AND MAINTENANCE WORK ZONES , 1990 .
[10] J W Hall,et al. CHARACTERISTICS OF CONSTRUCTION-ZONE ACCIDENTS , 1989 .
[11] Ah Beng Tee. The application of fuzzy mathematics to bridge condition assessment , 1988 .
[12] Gerald L Ullman,et al. ACCIDENTS AT ENTRANCE RAMPS IN LONG-TERM CONSTRUCTION WORK ZONES , 1992 .
[13] Lee D. Han,et al. PROPOSED MODEL FOR PREDICTING MOTORIST DELAYS AT TWO-LANE HIGHWAY WORK ZONES , 1993 .
[14] Z. Griliches,et al. Econometric Models for Count Data with an Application to the Patents-R&D Relationship , 1984 .
[15] Of references. , 1966, JAMA.
[16] Edward L. Frome,et al. Regression Analysis of Poisson-Distributed Data , 1973 .
[17] Stephen H Richards,et al. SOME EFFECTS OF TRAFFIC CONTROL ON FOUR-LANE DIVIDED HIGHWAYS , 1986 .
[18] B. M. Shustov,et al. An application of the , 1974 .
[19] A. Cameron,et al. Regression-based tests for overdispersion in the Poisson model☆ , 1990 .
[20] Fred R Hanscom. EFFECTIVENESS OF CHANGEABLE MESSAGE SIGNING AT FREEWAY CONSTRUCTION SITE LANE CLOSURES , 1982 .
[21] R A Krammes,et al. UPDATED CAPACITY VALUES FOR SHORT-TERM FREEWAY WORK ZONE LANE CLOSURES , 1994 .
[22] Rahim F Benekohal. SPEED REDUCTION METHODS AND STUDIES IN WORK ZONES: A SUMMARY OF FINDINGS. FINAL REPORT , 1992 .
[23] Zoltan Anthony Nemeth,et al. ACCIDENT CHARACTERISTICS BEFORE, DURING, AND AFTER SAFETY UPGRADING PROJECTS ON OHIO'S RURAL INTERSTATE SYSTEM , 1978 .